List of 2/5 military operations of the Vietnam War (1966 – 1971)
See also: Which 2/5 companies took part in each operation — Companies E, F, G, H and H&S at a glance.
| 2nd BATTALION, 5th MARINES — 1st MARINE DIVISION | |||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|
| VIETNAM WAR OPERATIONS | 1966 – 1971 | Arranged in Chronological Date Sequence | 59 Total Operations | |||||||||||
| Name of Operation | Mission Purpose / Objective | Dates of Operation | Locations / Cities | TAOR (Tactical Area of Responsibility) | USMC Units Involved | Mission Results | USMC KIA | USMC Wounded | Enemy KIA | Enemy Wounded | Notes / Source References |
| Operation Utah | Search and destroy operation to locate and engage the North Vietnamese 21st Regiment in the Quang Ngai area. Marines and ARVN forces air- assaulted into the area to destroy enemy forces threatening provincial towns. This was the Marines' first major contact with North Vietnamese Army regulars. | 4–7 March 1966 | Northwest of Quang Ngai City; Binh Son District; Quang Ngai Province | Quang Ngai Province, I Corps; approximately 25 km northwest of Quang Ngai City | Marine battalions in Utah were 2/7 (primary assault), 3/1, 2/4 and 1/7 with the ARVN 2d Division. | Operation as a whole: the North Vietnamese 21st Regiment suffered heavy casualties and withdrew. Company H had no part in the operation. | Whole operation: 98 (all USMC forces; previously recorded figure). | Whole operation: 278 (all USMC forces; previously recorded figure). | Whole operation: approximately 600 (previously recorded figure) | Unknown | CORRECTION: H COMPANY DID NOT PARTICIPATE. This file previously stated that H Company, 2/5 took part in a supporting role. The 2/5 Command Chronology for 23 February – 5 April 1966 places the battalion at Camp Schwab, Okinawa for the whole period. Hotel Company landed at Chu Lai on 13 April 1966, five weeks after Utah ended. Shulimson's official account of Utah (chapter 7) names 2/7, 3/1, 2/4 and 1/7 and never mentions 2/5. Primary source: 2/5 Command Chronology, 23 February – 5 April 1966 (Texas Tech University Vietnam Archive item 1201048067); Jack Shulimson, U.S. Marines in Vietnam: An Expanding War, 1966 (HQMC, 1982), ch. 7. |
| Operation Wyoming | Search and destroy mission in the northwestern portion of Ly Tin District, Quang Tin Province, northwest of Chu Lai, under 1st Marines Operation Order 327-66. 2/5's first operation in Vietnam. | 260730H April 1966 – 011922H May 1966 (2/5 after action report) | Northwestern Ly Tin District, Quang Tin Province; Landing Zone Eagle; Hill 69 complex, Chu Lai TAOR | Quang Tin Province, I Corps; northwest of Chu Lai | 2nd Battalion (-)(Rein), 5th Marines (LtCol R.H. Uskurait) with Company E (-)(Rein) (Capt J.L. Cooper) and Company F (Rein) (1stLt G.E. Burgett); 3d Platoon, Company E as battalion reserve (2ndLt T.J. Ebbert); controlling HQ 1st Marines. Supported by 1st Battalion, 11th Marines. | Companies E and F were lifted by helicopter from Hill 69 into LZ Eagle on 26 April and conducted detailed search and destroy sweeps without major initial contact. Scattered small-arms contacts on 30 April as the battalion moved to the truck point; last elements returned to the Hill 69 complex on 1 May. Heat casualties were significant. One VC suspect captured. | 2/5 total: 1 KIA and 1 died of wounds. Breakdown by 2/5 company: not recorded. | 2/5 total: 17 WIA. Breakdown by 2/5 company: not recorded. | Enemy losses reported only as probable/possible; 1 VC suspect captured | Unknown | CORRECTION: H COMPANY DID NOT PARTICIPATE. 2/5 did take part, but only with Companies E and F. The 2/5 Command Chronology for 8–30 April 1966 states: "A detachment from H&S Co, Co 'E', and Co 'F' participated." The combat after action report (in the May 1966 chronology) lists the same task organization. Hotel Company had taken over its sector of the Chu Lai TAOR on 14 April 1966 and stayed there. Corrected dates: the operation ran to 1 May 1966, not 30 April. Primary source: 2/5 Command Chronologies, April 1966 and May 1966, the latter including the Combat After Action Report for Wyoming dated 9 May 1966 (Texas Tech University Vietnam Archive items 1201048068 and 1201048069). |
| Operation Apache | Heliborne assault into a landing zone in the Quan Ly Tin area, seizure of Objective Cobra, establishment of a battalion combat base, and extensive search and destroy operations throughout the TAOR. Reconnaissance units were inserted first by helicopter into landing zones Canary, Sparrow and Robin to set up observation posts. Enemy expected: the 1st VC Regiment (32nd) and the Ly Tin and Ky Chanh guerrilla companies, estimated at 120 men in the local company and 250 in the battalion. | 090600H – 122000H June 1966. 2/5 Operation Order 305-66 was issued on 1 June 1966; the initial briefing was held on 5 June and a second on 7 June. | Quan Ly Tin (Ly Tin District), Quang Tin Province; Phu Duc (4); Ngoc Nha (4); Ky Chanh; the Hill 68 complex; Hill 130; Tam Ky. Launched from and returned to the Hill 69 combat base; Company B, 1/5 was lifted out to Hill 54. | 2/5 TAOR, Chu Lai, Quang Tin Province (Ly Tin District) | Controlling headquarters: 2nd Battalion (-)(Rein), 5th Marines (LtCol Walter Moore) with Company E (Rein) (Capt J. L. Cooper) and Company F (Rein) (1stLt G. S. Burgett). Attached: a detachment of H&S Company; a helicopter support team of the 1st Shore Party Battalion; a platoon of Company A, 1st Reconnaissance Battalion; engineer squads of the 1st Engineer Battalion; Battery E and the 4.2-inch mortar battery of 2/11; Battery L, 4/11; Company A (-), 1st Tank Battalion; Tam Ky Popular Forces squads; S-2 scouts, interpreters, tank liaison, 81mm mortar sections and sniper teams of the 5th Marines (two teams with Company E and three with Company F). Battalion reserve: Company B, 1st Battalion, 5th Marines. | 9 Jun: the battalion lifted from Hill 69 (BT 468073) into LZ Cobra. Company E landed about 1,000 metres east of the scheduled zone at 0645, Command Group Bravo at 0715, Company F at 0740; all units were in by 0745 with no enemy contact. At 1020 the battalion assaulted toward Phu Duc (4) from the Hill 68 complex against long-range sniper fire; the sweep of the village produced 4 VC killed, 4 wounded and 4 captured. Company B, 1/5 was lifted in as reserve at 1230 and a Popular Forces platoon flew in from Tam Ky at 1400 and was split among the companies. | Whole operation: 0 – the after action report records 0 killed and 0 died of wounds. Company E: 0; Company F: 0; H&S Company: 0. | 3 WIA. Four medical evacuation requests were made, with an average helicopter reaction time of 30 minutes; casualties were mostly heat exhaustion treated in the field, with shrapnel wounds evacuated to 1st Medical Battalion. Four Marines were evacuated for illness on 11 June. Breakdown by 2/5 company: not recorded. | 24 VC KIA confirmed and 41 possible | 24 VC WIA possible; 13 VC captured (VCC) and 13 VC suspects (VCS). Captured: 7 tons of rice, 25 pounds of documents, assorted uniforms, a hand grenade, 60 rounds of submachine gun ammunition and a training notebook with map symbols. | CREATED 29 SEPTEMBER 2026 FROM PRIMARY SOURCES. CORRECTION: H COMPANY DID NOT TAKE PART, AND APACHE WAS NOT HOTEL COMPANY'S FIRST OPERATION. It was requested as Hotel Company's first operation of 1966; the Combat Operation After Action Report does not support that. Its task organization lists only Company E (Rein) under Capt Cooper and Company F (Rein) under 1stLt Burgett as the manoeuvre companies, with Company B, 1/5 as battalion reserve, and no entry in the four-day sequence of events names Company H. Primary source: 2/5 Command Chronology, June 1966, including the Combat Operation After Action Report for Operation Apache dated 22 June 1966, 2/5 Operation Order 305-66 and Frag Orders 7-66, 14-66 and 15-66 (Texas Tech University Vietnam Archive item 1201…. |
| Operation Kansas | Reconnaissance-in-force in the Que Son Valley between Tam Ky and Hiep Duc after reports that the North Vietnamese 2d (620th) Division had entered the valley. Planned as an eight-battalion Marine-ARVN operation. When the Vietnamese Marine battalions were withdrawn, it was cut back to a reconnaissance effort supported by artillery, with infantry ready to exploit. | 17–22 June 1966 (official dates). The reconnaissance phase began 13 June; recon teams and artillery stayed in the area until 27–28 June. | Tam Ky; Hiep Duc; Nui Loc Son; Nui Vu (Hill 488); Hill 555; Thang Binh; Hill 29; Tien Phuoc Special Forces Camp; Quang Tin and Quang Nam Provinces | Que Son Valley, Quang Tin / Quang Nam Provinces | Task Force X-Ray (BGen William A. Stiles); 1st Reconnaissance Battalion (LtCol Arthur J. Sullivan); 1st Force Reconnaissance Company; Company C, 1/5 (relief of Howard's platoon); Company E, 2/5 (B-52 strike exploitation, 21 June); 3/1 (artillery security); 4/11, 4/12 and 2/11 artillery. | SSgt Jimmie L. Howard's 18-man reconnaissance platoon held Nui Vu (Hill 488) against a North Vietnamese battalion on the night of 15–16 June (Medal of Honor). Company C, 1/5 relieved the hill at dawn on 16 June; 42 enemy dead were counted. On 21 June, Company E, 2/5 was landed by helicopter about 3,500 meters east of Hiep Duc to exploit a B-52 Arc Light strike. It met minor resistance near the landing zone and was lifted out by 1015. Infantry participation was otherwise limited. | Whole operation: 15 US KIA (previously recorded figure). Company C, 1/5 at Nui Vu: 2 KIA. | Whole operation: 32 US WIA (previously recorded figure). Breakdown by 2/5 company: not recorded. | 85 confirmed (previously recorded figure); 42 enemy dead at Nui Vu | Unknown | H COMPANY DID NOT PARTICIPATE; Company E, 2/5 did. Shulimson's official account confirms that the only 2/5 involvement was Company E's heliborne exploitation of the B-52 strike on 21 June 1966. The 2/5 Command Chronology for June 1966 records the same insertion. It places Hotel Company in the Chu Lai TAOR, ending the month on Hill 35 providing security for the 5th Marines CP. Corrected dates: the official operation dates are 17–22 June 1966. Primary source: 2/5 Command Chronology, June 1966 (Texas Tech University Vietnam Archive item 1201048070); Jack Shulimson, U.S. Marines in Vietnam: An Expanding War, 1966 (HQMC, 1982), ch. 8, pp. 131–136. |
| Operation Hastings (Lam Son 289) | Counter the North Vietnamese 324B Division's crossing of the DMZ into northern Quang Tri Province. Task Force Delta (BGen Lowell E. English) was formed to find and destroy the division. | 15 July – 3 August 1966 | Quang Tri Province, south of the DMZ; Ngan River valley; Rockpile area; Dong Ha vicinity | Northern I Corps, Quang Tri Province | Task Force Delta battalions: 2/4, 2/1, 3/4, 3/5 (after Deckhouse II), 2/9, 1/3 and 1/1, with the ARVN 1st Division and airborne task force. | The North Vietnamese 324B Division was badly hurt and pushed back across the DMZ. The operation confirmed large-scale North Vietnamese infiltration and was followed by Operation Prairie. | Whole operation: 126 (all USMC forces; previously recorded figure). | Whole operation: 448 (all USMC forces; previously recorded figure). | Approximately 700+ (previously recorded figure) | Unknown | CORRECTION: H COMPANY DID NOT PARTICIPATE. This file previously listed "elements of 2nd Battalion, 5th Marines in supporting roles" and said H/2/5 "supported in operational area." Both are wrong. Shulimson's official account of Hastings names 2/4, 2/1, 3/4, 3/5, 2/9, 1/3 and 1/1, and never 2/5; 3/5 was the only 5th Marines battalion engaged. The 2/5 Command Chronology for July 1966 places Hotel Company on Hill 35 (BT 435079) in the Chu Lai TAOR, 250 miles south, for the whole month. 2/5's only DMZ service was in Operation Prairie, from 30 September 1966. Primary source: 2/5 Command Chronology, July 1966 (Texas Tech University Vietnam Archive item 1201048071); Jack Shulimson, U.S. Marines in Vietnam: An Expanding War, 1966 (HQMC, 1982). |
| Operation Deckhouse II | Amphibious assault by the Seventh Fleet Special Landing Force, reported separately from Operation Hastings. It landed on the coast east of the Hastings area. Once ashore, BLT 3/5 was to join Task Force Delta inland. | 16–18 July 1966 | Blue Beach, 2,500 meters north of the mouth of the Cua Viet River; about eight miles northeast of Dong Ha; Quang Tri Province | Northern coastal Quang Tri Province, near the Cua Viet River | Special Landing Force BLT 3/5 (LtCol Edward J. Bronars), Companies I and K in the initial landing, with HMM-363 (LtCol James D. McGough). | Companies I and K of BLT 3/5 landed with ease at 0630 on 16 July. The operation was terminated after the SLF was firmly ashore, and BLT 3/5 joined Task Force Delta in Operation Hastings. | Minimal (specific figures not available). | Minimal (specific figures not available). | Unknown | Unknown | CORRECTION: H COMPANY DID NOT PARTICIPATE. This file previously said H/2/5 was involved in a supporting capacity and listed "elements of 2nd Battalion, 5th Marines." Both statements are wrong. Deckhouse II was a 3/5 Special Landing Force operation. The 2/5 Command Chronology for July 1966 places Hotel Company's CP at BT 435079 (Hill 35) in the Chu Lai TAOR throughout the month. It records daily patrols there and does not mention Deckhouse II or Hastings. Primary source: 2/5 Command Chronology, July 1966 (Texas Tech University Vietnam Archive item 1201048071); Jack Shulimson, U.S. Marines in Vietnam: An Expanding War, 1966 (HQMC, 1982). |
| Operation Prairie (Prairie I) | Prevent the North Vietnamese Army 324B Division from crossing the DMZ and establishing a major base area in northern Quang Tri Province. 2/5 was rushed north from Chu Lai when late-September intelligence predicted a multi-division NVA offensive across the DMZ. | 3 August 1966 – 31 January 1967 (whole operation). H Company, 2/5 in the operation: 30 September – 23 November 1966 | Quang Tri Province, immediately south of the DMZ; Dong Ha; Con Thien; Cam Lo District; Gio Linh; Leatherneck Square (bounded by Con Thien, Gio Linh, Dong Ha and Cam Lo). Departure point: Hill 69, Chu Lai TAOR. | Operation Prairie TAOR, eastern half (4th Marines), Quang Tri Province; 4th Marines AO extending about 5,000 metres east of Con Thien; Leatherneck Square. 2/5 remained OPCON 3d Marine Division, 4th Marines through October 1966. | English; 1/4, 3/4, 3/7, 1/3, 2/9; 12th Marines artillery. | 30 Sep 1966: Company H and Bravo Command Group left Hill 69 at 0530H, were airlifted from Chu Lai and reached Dong Ha at 0900H to set up the battalion support base; the rest of 2/5 followed that night. 12–14 Oct: Company H in heavy contact with NVA units – 16 NVA confirmed killed and 6 weapons captured on 14 Oct. 17 Oct: Battalion CP Group ambushed; Company H swept southwest with tanks. Late Oct: 2/5 took over Con Thien from the ARVN. The NVA did not establish its base area south of the DMZ; the expected offensive never came. | Whole operation: about 200 (Shulimson) to 226 Marines killed. Company H: 1 KIA (12 Oct) and 2 KIA (14 Oct) documented. 2/5 for October 1966: 22 KIA plus 2 died of wounds. | Whole operation: well over 1,000 (1,159 commonly cited). Company H: 3 WIA (12 Oct) and 5 WIA (14 Oct) documented. 2/5 for October 1966: 137 WIA. | Company H: 8 NVA confirmed, rising to 16 confirmed, on 14 Oct. 2/5 for October 1966: about 89 confirmed. Whole operation: 1,397 claimed. | Unknown | CONFIRMED H COMPANY ENGAGEMENT. The 2/5 Command Chronology for October 1966 (Texas Tech item 1201048074) records H Company as the advance party: “At 300530H Sept 1966 an advanced party consisting of Co. ‘H’ and Bravo Command Group departed Hill 69.” CORRECTION: the departure point was Hill 69, not Hill 65 (confirmed by 1stLt James J. Kirschke, who commanded H Company at the time). The official history (Shulimson, p. 198) mentions only “some probes in mid-October”; the battalion’s own record shows sustained fighting on 12– 14 October. COMMAND. H Company: 1stLt J. J. Kirschke, 1–8 October 1966; Capt J. A. Primary source: 2/5 Command Chronologies, October and December 1966 (Texas Tech Vietnam Archive items 1201048074 and 1201048075; originals at National Archives, RG 127); Jack Shulimson, U.S. Marines in Vietnam: An Expanding War, 1966 (HQMC, 1982), ch. |
| Operation Colorado (Lien Ket 52) | Search and destroy PAVN 2nd Division in Que Son Valley; combined US-ARVN operation to clear Hiep Duc District. | 6–22 Aug 1966 | Hiep Duc District; Que Son Valley; Quang Nam Province; ~55 km south of Da Nang | Que Son Valley; Hiep Duc District; Quang Nam Province; ~55 km SSW of Da Nang | 2nd Battalion (-)(Rein), 5th Marines (LtCol Walter Moore) with Company E (Rein) (Capt J.L. Cooper), Company G (Rein) (Capt J.M. Gruner) and Company H (Rein) (Capt R.D. Hughes, who took the company on 26 June 1966); 5th Marine Regiment; 1/5; ARVN 2d Division; 2/11 artillery; 1st Marine Aircraft Wing. | 2/5 made twelve helicopter insertions and extractions. 6 Aug: Company H (Rein) was helilifted from Hill 69 to the first objective at 060915H, went into the landing zone at 061015H and swept north-east behind air strikes; it was extracted at 061430H with four heat casualties, having taken seven VC suspects. 7–8 Aug: the 1st Platoon with a section of tanks held a bridge until Regional and Popular Forces relieved it. 9 Aug: blocking positions across enemy withdrawal routes in the Song Ly Ly valley; Company H cleared a village near Hill 150. 12 Aug, 0215H: an 81mm mortar and 57mm recoilless rifle attack on the 2/5 perimeter at Tam Ky fell mainly on Company H; | Whole operation: 99 (all USMC forces; previously recorded figure). Company H: 3 KIA, all in the 12 August mortar and recoilless rifle attack on the Tam Ky perimeter. 2/5 after action report (partly illegible scan): 3 KIA, plus 2 Marines killed by lightning on 12 August. | Whole operation: 212 (previously recorded figure). Company H: 28 WIA in the 12 August attack per the consolidated casualty report (the immediate report gave 22), plus 3 WIA in Company G. 2/5 total about 39 WIA and 7 lightning injuries; 15 heat casualties, four of them from Company H on 6 August. | 2/5: 9 VC KIA confirmed by 9 August. Whole operation: 283 (previously recorded figure). | Unknown | H/2/5 participated as part of regimental ops. Source doc confirms 2/5 Marines task org. Sources: Marine Corps History Division. |
| Operation Napa (Lien Ket 56) | Regimental search and destroy operation in Tam Ky District with ARVN forces, following Operation Colorado. | D-Day 5 September 1966; units moved to Tam Ky 4 September; terminated 151200H September 1966 (5th Marines after action report) | Quang Tin Province, Tam Ky District; regimental forward CP at Tam Ky; Cam Khe (1) | Quang Tin Province, Tam Ky District | 5th Marines (Col C.F. Widdecke), controlling, with ARVN 2d Division elements. Units: 1st Battalion, 5th Marines (area one, north); 3rd Battalion, 5th Marines (LtCol E.J. Bronars; Companies I, K and L; areas two, three and four); Company G (-)(Rein), 2/5 (Capt J.M. Gruner) with one platoon of Company H attached, under 5th Marines control as regimental reserve and security for the regimental CP and the 2/11 artillery at Tam Ky; 2/11 (-) and 4/11 artillery; a platoon of Ontos from Company B, 1st Anti-Tank Battalion; 1st Reconnaissance Battalion platoons; engineers and scout dogs. | 5th Marines received the initiating directive at 1850 on 3 September and issued Frag Order 12-66 (El Paso) the same day; 1st Marine Division ordered "Execute El Paso, D-Day 5 Sept." 4 Sep: all units moved to Tam Ky (BT 292229). The Company G / H platoon reserve left Hill 69 at 1400 and reached Tam Ky at 1520. 5 Sep (D-Day): 1st Battalion moved into area one; its companies were probed that night by two main-force squads. 6 Sep: a reconnaissance platoon was inserted on Hill 253 (BT 183205). 7 Sep: 1st Battalion and the regimental HQ (-) returned to Chu Lai. 8–13 Sep: 3rd Battalion searched areas two, three and four against local-force VC firing from tree lines at long range. | 7 KIA (5th Marines, whole operation). Company G, 2/5 with the attached Company H platoon: 1 KIA. | 51 WIA and 52 non-battle casualties (whole operation). Company G, 2/5 with the Company H platoon: 3 WIA. | 20 VC KIA confirmed, 46 VC KIA probable | 8 VC WIA confirmed, 18 probable; 61 VC captured and 56 VC suspects detained | PARTIALLY CONFIRMED: ONE H COMPANY PLATOON. This file previously said 2/5 was not listed. The 5th Marines Command Chronology for September 1966 settles it: "OPERATION NAPA was conducted with the 1st, 2nd and 3rd Battalions of the Regiment in conjunction with ARVN forces from 5 September to 15 September 1966." The attached after action report assigns "Co G (-)(Rein) w/1 Plt Co H" as regimental reserve and security at Tam Ky. The 2/5 Command Chronology for September 1966 survives only as two unreadable pages, so the regimental record is the source. Primary source: 5th Marines Command Chronology, September 1966, including the Napa after action report (Texas Tech University Vietnam Archive item 1201046139). |
| Operation El Paso | Coordinated search and destroy operation with elements of the ARVN 2d Division in the Tam Ky area (5th Marines Frag Orders 12-66, 13-66 and 14- 66; 1st Marine Division Frag Order 15-66, "Operation El Paso"). Enemy expected: elements of the 21st NVA Regiment, the 70th VC Battalion, the 72nd VC Main Force Battalion and two local companies (C/16 and K-52). | D-Day 5 September 1966. Units moved to Tam Ky on 4 September; the operation terminated at 151200H September 1966 (5th Marines after action report). | Tam Ky District, Quang Tin Province; regimental CP and logistic support area at Tam Ky; areas one to four west of Tam Ky; Thon Bon and Qui Xuan hamlets; Hill 26; Hill 253 | Tam Ky area, Quang Tin Province | 5th Marines (Col C.F. Widdecke), controlling, with ARVN 2d Division elements. Units: 1st Battalion, 5th Marines (area one, north); 3rd Battalion, 5th Marines (LtCol E.J. Bronars; Companies I, K and L; areas two, three and four); Company G (-)(Rein), 2/5 (Capt J.M. Gruner) with one platoon of Company H attached, under 5th Marines control as regimental reserve and security for the regimental CP and the 2/11 artillery at Tam Ky; 2/11 (-) and 4/11 artillery; a platoon of Ontos from Company B, 1st Anti-Tank Battalion; 1st Reconnaissance Battalion platoons; engineers and scout dogs. | 5th Marines received the initiating directive at 1850 on 3 September and issued Frag Order 12-66 (El Paso) the same day; 1st Marine Division ordered "Execute El Paso, D-Day 5 Sept." 4 Sep: all units moved to Tam Ky (BT 292229). The Company G / H platoon reserve left Hill 69 at 1400 and reached Tam Ky at 1520. 5 Sep (D-Day): 1st Battalion moved into area one; its companies were probed that night by two main-force squads. 6 Sep: a reconnaissance platoon was inserted on Hill 253 (BT 183205). 7 Sep: 1st Battalion and the regimental HQ (-) returned to Chu Lai. 8–13 Sep: 3rd Battalion searched areas two, three and four against local-force VC firing from tree lines at long range. | 7 KIA (5th Marines, whole operation). Company G, 2/5 with the attached Company H platoon: 1 KIA. | 51 WIA and 52 non-battle casualties (5th Marines, whole operation). Company G, 2/5 with the Company H platoon: 3 WIA. | 20 VC KIA confirmed, 46 VC KIA probable (5th Marines, whole operation) | 8 VC WIA confirmed, 18 probable; 61 VC captured (VCC) and 56 VC suspects detained; 7 weapons captured by 3/5 | SAME OPERATION AS NAPA (LIEN KET 56), which it was originally designated. H COMPANY TOOK PART WITH ONE PLATOON. EL PASO AND NAPA ARE THE SAME OPERATION. The 5th Marines Combat After Action Report (September 1966 chronology) states: "Operation Napa originally designated El Paso, was conceived approximately one week prior to instigation. At 031850H 5th Marines received the initiating directive and issued Frag Order 12-66 the same day." The 1st Marine Division message ordering it, filed in the same chronology, is headed "Frag O 15-66 – Operation El Paso" and reads "Execute El Paso, D-Day 5 Sept." The 3/5 chronology lists Frag Order 12-66 as "El Paso" and 13-66 as "Napa. Primary source: 5th Marines Command Chronology, September 1966, including the regimental Combat After Action Report, 1st Marine Division Frag Order 15-66 (Operation El Paso), the Company G, 2/5 Combat Operation After Action Report dated 21 September 1966,…. |
| Operation Monterey | 5th Marines search and destroy operation (5th Marines Frag Order 15-66, 272355Z Sep 66; 1/5 Operation Order 1-66) in the Suoi Cau Chau and Suoi Giang / Song Ba Ky valleys along the Tam Ky – Tien Phuoc road, against suspected battalions of the North Vietnamese 21st Regiment (620th Division) and local VC companies. It was cut short when 1st Marine Division Frag Order 25-66 sent 2/5 north to reinforce northern I Corps, and 5th Marines battalions were needed to cover 2/5's area. | 290630H – 301150H September 1966 (1/5 after action report); the 5th Marines chronology records termination at 300600H. It was ended by 1st Marine Division message 291514Z September. | Tam Ky – Tien Phuoc road; Suoi Cau Chau and Suoi Giang / Song Ba Ky valleys; Hill 94; Quang Tin Province. Staged from Hill 54. Map sheets 6757 IV Phu Nam, 6739 IV Tra Bong, 6639 I Tien Phuoc, 6640 II Tam Ky. | 5th Marines area west of Tam Ky; Quang Tin Province | 5th Marines (Col C.F. Widdecke). 1st Battalion, 5th Marines (LtCol E.R. Watson): Company C (Capt H.B. Darling), Company D, 81mm platoon, attached engineers, scout dogs and ARVN interpreters. Attached from 3/5: Company K (Capt R.E. Maresco) in the sweep and Company L as security for Battery E, 2/11 (direct support); Company M covered the 1/5 TAOR. Battery L, 4/11 in general support; four H-34s at Hill 54; A-4s and UH-1Es on call. | 29 Sep: at 0630 Company L 3/5 and Battery E 2/11 moved by truck convoy to BT 301189. At 0810 Companies C, D and K moved by truck to BT 291201 and at 0900 began searching along the Tam Ky – Tien Phuoc road. Company D destroyed a tunnel at 1045, and the lead elements reached BT 261188 and BT 258188 with no contact. At 1445 Company C took sniper fire from a hut near BT 237168; it returned fire with 81mm mortars and small arms and found a blood trail. Night defensive positions were set at 1630. 30 Sep: at 0810 all units moved back to the pickup point, then trucked back to Hill 54, securing from the operation at 1150. | Not reported. | Not reported. | 1 VC WIA (probable) | 1 VC WIA probable; 1 VC suspect detained and sent to the 12th Division Tactical Area at Quang Ngai | CORRECTION: H COMPANY AND 2/5 DID NOT PARTICIPATE. An earlier version of this file said 2/5 was part of the plan. The 1st Battalion, 5th Marines Combat Operation After Action Report for Monterey (2 October 1966) and the 3rd Battalion, 5th Marines chronology for September 1966 show otherwise. Monterey was carried out by 1/5 with Companies K and L of 3/5 attached; no 2/5 unit took part. The 5th Marines chronology connects the operation to 2/5 only because it was cut short: "The short time involved resulted from the requirement to chop the 2nd Battalion, 5th Marines to 3rd Marine Division. Primary source: 1st Battalion, 5th Marines Command Chronology, September 1966, including the Combat Operation After Action Report for Monterey dated 2 October 1966 (Texas Tech University Vietnam Archive item 1201048007); 3rd Battalion, 5th Marines Command…. |
| Operation Monterey II | Described on Wikipedia as a 1/5 and 2/5 security operation in Quang Tin Province. The only contemporary use of the name found is a recommendation: on 2 October 1966 the 1/5 commander, LtCol E.R. Watson, closed his Monterey after action report by recommending "that Operation Monterey II be conducted in the near future." His reasoning was that contact with local and main force enemy units would have come had Monterey not been cut short. | Listed on Wikipedia as 30 September – 2 October 1966. No record of the operation being carried out was found in the 5th Marines, 1/5, 2/5 or 3/5 chronologies for October 1966. | Presumably the same objective area as Monterey: Tam Ky – Tien Phuoc road and the Suoi Cau Chau / Suoi Giang / Song Ba Ky valleys, Quang Tin Province (not confirmed) | 5th Marines area west of Tam Ky; Quang Tin Province (not confirmed) | On 30 September 1966 2/5 (-) with Companies F, G and H flew from Chu Lai to Dong Ha, arriving at 2330, and on 1 October came under Task Force Delta in Operation Prairie. 1/5's own October 1966 chronology places the battalion on Hill 54 controlling its TAOR, with its only named operation that month being Dover (19–30 October, with the 6th ARVN Regiment). | No results recorded. The 5th Marines, 1/5 and 3/5 chronologies for October 1966 do not mention a Monterey II. If it took place, it was a small unrecorded action; otherwise the Wikipedia entry reflects a planned or recommended operation that was never carried out. | Not recorded. | Not recorded. | None recorded | Unknown | H COMPANY AND 2/5 DID NOT PARTICIPATE; EXECUTION NOT CONFIRMED. This is a new file. Monterey II appears in Wikipedia's list of operations, which gives 30 September – 2 October 1966 and names 1/5 and 2/5. The primary records don't support it. (1) 2/5 was flying to Dong Ha on 30 September and was in Operation Prairie from 1 October; its October 1966 chronology does not mention Monterey II. (2) The 1st Battalion, 5th Marines only recommended a Monterey II, in its 2 October 1966 after action report. Its October 1966 chronology, which lists its activities including Operation Dover, does not record one. Primary source: 1st Battalion, 5th Marines Command Chronologies, September 1966 (Monterey after action report, 2 October 1966) and October 1966 (Texas Tech University Vietnam Archive items 1201048007 and 1201048008); 3rd Battalion, 5th Marines Command Chro…. |
| Operation Dover | Search and destroy operation in Quang Tin Province (previously recorded description). | 18–30 October 1966 (previously recorded dates; not found in the 5th Marines or 2/5 chronologies) | Quang Tin Province; I Corps Tactical Zone | Quang Tin Province, I Corps | 2/5 (-) with Companies F, G and H was on the DMZ in Operation Prairie for the whole of October 1966, under the 4th Marines and 3d Marine Division. Previously recorded participant: 1st Battalion, 5th Marines. | Specific results not available. Company H was at Dong Ha and Con Thien at the time. | Whole operation: not available. | Whole operation: not available. | Not Available | Unknown | CORRECTION: H COMPANY DID NOT PARTICIPATE. On these dates Hotel Company was 250 miles north in Operation Prairie. It led 2/5 to Dong Ha on 30 September 1966, was in heavy contact on 12–14 October, and 2/5 took over Con Thien in late October. The 2/5 Command Chronology for October 1966 records the battalion under 3d Marine Division and 4th Marines control all month. Neither the 5th Marines chronology for October 1966 nor 2/5's own chronology mentions an Operation Dover. See Operation_Prairie_I.docx. Primary source: 2/5 Command Chronology, October 1966 (Texas Tech University Vietnam Archive item 1201048074); 5th Marines Command Chronology, October 1966 (item 1201046140). |
| Operation Mississippi | Reconnaissance in force and search and destroy operation under the 9th Marines (Operation Orders 124-66 and 125-66; 2/5 Frag Order 30-66). 2/5 was to land by helicopter in the Que Son District objective area, attack west through the mountain pass to the eastern end of Antenna Valley, and find, capture or destroy enemy forces, supplies, equipment and documents. It was also to be ready to withdraw by helicopter or on foot. | 291000H November – 071730H December 1966 (D-Day was set for 25 November and postponed each day by weather until 29 November) | Que Son and Duc Duc districts, Quang Nam Province; the mountain pass into eastern Antenna Valley; Dai Phong (1) hamlet; Son Phu (1) hamlet; Hill 90 | 9th Marines area; Que Son – Antenna Valley; Quang Nam Province. 2/5 had been assigned the An Hoa TAOR on 27 November 1966. | Controlling HQ: 9th Marines. 2nd Battalion (-)(Rein), 5th Marines (LtCol W.C. Airheart): Company F (Rein) (Capt G.S. Burgett), Company G (Rein) (Capt J.M. Gruner), Company H (Rein) (Capt J.J. Doherty). Attached: H&S Company (-), detachments of the 3d Shore Party and 3d Engineer Battalions, scout dogs, interrogator-translator and counterintelligence teams. Battery E, 2/11 in direct support; Battery F, 2/12 reinforcing. | 29 Nov: the battalion was lifted from An Hoa into the objective area under sniper fire; one Marine hit in the helicopter later died of wounds. Company G was pinned by a reinforced VC platoon with two .50-caliber machine guns until air strikes silenced one gun (2 USMC KIA, 4 WIA, 3 VC KIA). That night Companies G and H held the trail line west of the landing zone. 30 Nov – 3 Dec: the battalion pushed west through the pass, which was lined with fighting holes about every 20 meters. Company H set up at AT 933376 and ran patrol sweeps. About 200 civilians asked to be relocated. Company H's position at AT 915387 took automatic-weapons fire from an estimated VC squad; | 2 KIA (Company G, 29 Nov) and 1 died of wounds; the after action report's casualty table is partly illegible. | Partly illegible in the after action report (Company G alone had 4 WIA on 29 Nov). 49 non-battle casualties, mostly immersion foot. | Partly illegible in the after action report; at least 4 VC killed in recorded contacts | Unknown. Captured: 50.6 tons of rice, grenades, mines and booby traps, uniforms, medical kits and documents. VC suspects and ralliers were detained for interrogation. | CONFIRMED H COMPANY PARTICIPATION. This is a new file, built from 2/5's Combat Operation After Action Report for Mississippi (14 December 1966), filed with the December 1966 Command Chronology. The report lists Company H (Rein) under Capt J. Doherty in the task organization, and its day-by-day narrative records H Company's positions and contacts. Mississippi was the battalion's first operation after the DMZ. The warning order reached 2/5 on 22 November 1966 while it was still at Dong Ha under the 4th Marines in Operation Prairie. Primary source: 2/5 Command Chronology, December 1966, including the Combat Operation After Action Report for Operation Mississippi dated 14 December 1966 (Texas Tech University Vietnam Archive item 1201048075). |
| Operation Sutter | Search and destroy operation in Quang Tin Province (previously recorded description). | 30 November – 6 December 1966 (previously recorded dates; not found in the 5th Marines or 2/5 chronologies) | Quang Tin Province; I Corps Tactical Zone | Quang Tin Province, I Corps | On these dates 2/5 (-)(Rein) was in Operation Mississippi in the An Hoa – Antenna Valley area under 9th Marines control (291000H November – 071730H December 1966). Previously recorded participant in Sutter: 1st Battalion, 5th Marines. | Specific results not available. 2/5's own operation on these dates, Mississippi, recovered about 50 tons of VC rice and evacuated about 2,000 civilians. | Whole operation: not available. | Whole operation: not available. | Not Available | Unknown | CORRECTION: H COMPANY DID NOT PARTICIPATE. After Operation Prairie, 2/5 began operating out of An Hoa on 22 November 1966 and was given operational control of the An Hoa TAOR on 27 November. The 2/5 Command Chronology for December 1966 records the battalion in Operation Mississippi from 291000H November to 071730H December 1966, the same dates as Sutter. Neither the 5th Marines chronologies for November–December 1966 nor 2/5's own chronology mention an Operation Sutter. Primary source: 2/5 Command Chronology, December 1966 (Texas Tech University Vietnam Archive item 1201048075); 5th Marines Command Chronologies, November and December 1966 (items 1201046141–1201046142). |
| Operation Lincoln | Search and destroy operation in Antenna Valley, in the southeastern part of the 2/5 TAOR, against a VC local force battalion and guerrillas. | 050530H – 091200H January 1967 (2/5 after action report; previously listed as 4–9 January) | Quang Duc Duc District; Antenna Valley; Quang Nam Province; staged from An Hoa; relay station at the Nong Son coal mine | 2/5 TAOR, An Hoa, Quang Nam Province; Antenna Valley | 2nd Battalion (-), 5th Marines (LtCol W.C. Airheart) with Company F (-) (Capt G.S. Burgett) and Company G (-) (Capt J.M. Gruner); Battery E, 2/11; engineer and scout teams. | Enemy contacts involved 1 to 20 men, mostly sniper fire; one ambush, when Company F received about 400 rounds at AT 865387. The valley was flooded and many hamlets deserted; one hamlet at AT 924369 had been destroyed. A large rice cache was found. Company F returned overland to Nong Son and Company G and the command group to An Hoa on 9 January. | Not stated for 2/5; light. Breakdown by 2/5 company: not recorded. | 9 evacuated (all causes). Breakdown by 2/5 company: not recorded. | Small numbers (partly illegible in the after action report) | Unknown | CORRECTION: H COMPANY DID NOT PARTICIPATE. The Combat After Action Report for Lincoln (2/5 Command Chronology, January 1967) lists only Companies F and G under the battalion command group. Hotel Company, under Capt Jerome J. Doherty, was in the An Hoa TAOR, and its next operation was Tuscaloosa on 24 January. Corrected dates: 5–9 January 1967. Primary source: 2/5 Command Chronology, January 1967, including the Combat After Action Report for Lincoln dated 12 January 1967 (Texas Tech University Vietnam Archive item 1201048076). |
| Operation Tuscaloosa | Search and destroy targeting VC B-20th Main Force Battalion HQ along Song Thu Bon River; assault VC HQ at Phu Loi village; destroy VC command infrastructure. | 24–28 Jan 1967 | Song Thu Bon River valley; ~24 km SW of Da Nang; Quang Nam Province; Phu Loi village area | Song Thu Bon River valley; Arizona Territory; Quang Nam Province; An Hoa area | 2nd Battalion (-)(Rein), 5th Marines (LtCol W.C. Airheart): Company F (Rein) (Capt G.S. Burgett Jr.), Company H (Rein) (Capt J.J. Doherty Jr.). Sparrow Hawk #1 was the 3d Platoon, Company G; Sparrow Hawk #2 was the 2d Platoon, Company E. Company D, 1/26 was under operational control 27–28 January. Supported by E/2/11, a tank detachment, LVTs, air and artillery. | 24–25 Jan: Company H swept south and east from its line of departure; contact was light and the hamlets were deserted. 26 Jan, about 0900: as F and H began their return sweep and crossed the river, heavy contact developed with the R-20th Main Force Battalion, dug in along the east-west road. Company H followed F Company across the river under heavy fire and advanced west along the road. The fight lasted about nine hours and covered several thousand meters, with continuous air, artillery and 81mm support. Both Sparrow Hawk platoons were inserted as blocking forces. Several Navy corpsmen were killed in action. | 17 KIA (battalion total for the operation, nearly all on 26 January; company breakdown not given). Breakdown by 2/5 company: not recorded. | 38 WIA evacuated and 14 WIA not evacuated (52 total; battalion total). Breakdown by 2/5 company: not recorded. | 79 KIA confirmed, 64 KIA probable | 28 WIA confirmed, 50 WIA probable; 2 detainees; 75 refugees evacuated | CONFIRMED H COMPANY. DATES CORRECTED: Source document confirms 24-28 Jan 1967 (previously recorded as 'Late 1967'). Documented in Culbertson, 'Operation Tuscaloosa'. Sources: hotel25vv.com; '2-5 Military Operations Vietnam'; Culbertson book. |
| Operation Independence | 9th Marines-controlled search and destroy operation to seal off and destroy enemy forces in the part of the 2/5 TAOR north of the Song Thu Bon. | 010000H – 090900H February 1967 | Duc Duc and Dai Loc districts, Quang Nam Province. The area was bounded north by the Song Vu Gia, east by the Song Thu Bon, and west by the 1st Marine Division TAOR boundary. Map sheets 6540 I and 6640 III– IV. | 2/5 TAOR north of the Song Thu Bon; Quang Nam Province | Controlling HQ: 9th Marines. 2nd Battalion (-)(Rein), 5th Marines (LtCol M.C. Jackson Jr.): Company E (Rein), Company F (-), Company H (-), Company A (Rein) 1/1, Company B (Rein) 1/1. 2/4 landed to the north and 1/5 blocked on the east bank. | 2/5 was inserted by helicopter south of the 2/4 landing zone and drove the enemy north into other Marine units, while CIDG blocked the west and 1/5 and the river blocked the east. Company H was not originally scheduled to take part. It was given the mission of blocking along the east bank of the Song Thu Bon with Company F (-), and from 2 February held that line with a platoon of Company F attached. At 2150H on 6 February, Company H's position at AT 905525 took heavy small-arms fire and rifle grenades. On 8 February its 3d Platoon was in contact with 7 VC at AT 800509. | Not legible in the after action report scan (low). Breakdown by 2/5 company: not recorded. | Not legible in the after action report scan. Breakdown by 2/5 company: not recorded. | Figures partly illegible; the after action report cites a high kill ratio | 21 WIA confirmed, 11 WIA probable; 52 detainees; 293 refugees | CONFIRMED H COMPANY PARTICIPATION. This file previously gave no detail. The Combat Operations After Action Report (2/5 Command Chronology, February 1967) lists Company H (-) in the task organization. It adds: "Although not initially scheduled to participate, Co H was later given the mission to block along the east bank of the Song Thu Bon in conjunction with Co F (-)." Independence was controlled by the 9th Marines. The 2/5 Command Chronology for February 1967 lists Capt R. W. Layer as Company H commander for 1–28 February 1967; Capt James A. Primary source: 2/5 Command Chronology, February 1967, including the Combat Operations After Action Report for Independence dated February 1967 (Texas Tech University Vietnam Archive item 1201048079). |
| Operation Prairie II | Continue offensive operations to eliminate PAVN forces south of the DMZ following Prairie I. Maintain pressure on PAVN 324B Division and prevent reconsolidation of enemy forces in Leatherneck Square area. | 1 February – 18 March 1967 | Prairie II: Quang Tri Province; Con Thien; Gio Linh; DMZ southern buffer zone; Leatherneck Square. H Company, 2/5 at the same time: An Hoa Combat Base and the Thu Bon River valley, Quang Nam Province. | Prairie II: northern I Corps, Quang Tri Province; DMZ area; Leatherneck Square. H Company, 2/5: 2/5 An Hoa TAOR, Quang Nam Province. | Prairie II was a 3d Marine Division operation in Quang Tri Province. 2/5 had left the DMZ in November 1966 and was under 1st Marine Division control at An Hoa, Quang Nam Province, throughout this period. | Company H was at An Hoa, about 280 km south, not in this operation. During these dates 2/5 fought Operation Independence (1–9 Feb 1967) and Operation Lanoke (late Feb), and conducted Operation New Castle, County Fair and river raids in March; Company H made an amphibious raid with tanks and LVTP-5s from An Hoa on Giang Hoa (2), AT 890520. Operation as a whole (3d Marine Division): Continued attrition of PAVN forces. Marines maintained forward positions at Con Thien and Gio Linh under heavy artillery fire. Enemy infiltration continued despite Marine operations. Confirmed ongoing PAVN presence and determination to contest northern I Corps. | Whole operation: 93 (all USMC forces). | Whole operation: 483 (all USMC forces). | Whole operation: 694 | Unknown | CORRECTION: H COMPANY DID NOT PARTICIPATE. This file previously stated that H/2/5 “continued rotation through DMZ operational area.” That is wrong. 2/5’s only service on the DMZ was in Operation Prairie (Prairie I), 30 September – 23 November 1966. The February and March 1967 command chronologies place the battalion at An Hoa for both months. |
| Operation Stone | Search and destroy operation against the R-20 Main Force Battalion on and near Go Noi Island, west of Hoi An (previously recorded description). | 11–22 February 1967 (previously recorded dates) | Go Noi Island area; west of Hoi An; Quang Nam Province | Go Noi Island area; Quang Nam Province | The only 2/5 unit was Company G, placed under another battalion's operational control at 0700 on 12 February 1967 (the chronology scan reads "2/4"). Previously recorded battalions: 1/1, 2/1 and 1/26. | Previously recorded results: by 12 February, 68 VC confirmed killed, 25 prisoners and 17 weapons captured. Company H remained in the An Hoa TAOR. | Whole operation: 9 (previously recorded figure). Breakdown by 2/5 company: not recorded. | Whole operation: 76 (previously recorded figure). Breakdown by 2/5 company: not recorded. | 68 VC confirmed (previously recorded figure) | Unknown | CORRECTION: H COMPANY DID NOT PARTICIPATE. The 2/5 Command Chronology for February 1967 records only that "At 120700H Co G reported OPCON to 2/4 [scan reading] for Operation Stone." No other 2/5 company is mentioned in connection with Stone. During these dates Hotel Company was in the An Hoa TAOR after Operation Independence, and it took part in Operation Lanoke at the end of the month. Primary source: 2/5 Command Chronology, February 1967 (Texas Tech University Vietnam Archive item 1201048079). |
| Operation Lanoke | Search and destroy operation astride Liberty Road to destroy or capture enemy forces and equipment, so that movement between Phu Loc (6) and An Hoa Combat Base would be unhampered. | D-Day 26 February 1967, H-Hour 0700 (Frag Order 03-67 issued at An Hoa 241800H February 1967); previously listed as 25–28 February | Liberty Road between Phu Loc (6) and An Hoa Combat Base; Song Thu Bon; Duc Duc and Duy Xuyen districts; Quang Nam Province | 2/5 An Hoa TAOR; Liberty Road corridor; Quang Nam Province | 2nd Battalion (-)(Rein), 5th Marines (LtCol M.C. Jackson Jr.). Two LVTP-5s each were attached to Company G and Company H; a tank section and platoon were in support; H&S Company took over the rifle companies' sectors of the An Hoa perimeter. One company swept west of Liberty Road to the Song Thu Bon, one swept east then north, and one blocked from My Loc (2) and Phu Loc (6). | Security of Liberty Road was re-established so convoys could run to An Hoa and Vietnamese civilian engineers could reopen the road south to Nong Son. The chronology's narrative and journal scans are too poor to give results. | Not legible in the chronology scan. Breakdown by 2/5 company: not recorded. | Not legible in the chronology scan. Breakdown by 2/5 company: not recorded. | Not legible in the chronology scan | Unknown | CONFIRMED H COMPANY PARTICIPATION (maneuver company with LVTs). Frag Order 03-67 (LANOKE), filed with the 2/5 Command Chronology for February 1967, sets D-Day as 26 February 1967 and attaches LVTP-5 amphibian tractors to Companies G and H. The operation reopened Liberty Road, the only land route into An Hoa. Hotel Company's commander in February 1967 was Capt James A. Graham. Primary source: 2/5 Command Chronology, February 1967, including Frag Order 03-67 (Lanoke) and its operation overlay (Texas Tech University Vietnam Archive item 1201048079). |
| Operation Prairie III | Continue clearance of PAVN forces from the Leatherneck Square area; disrupt enemy operations between Con Thien and the DMZ; maintain Marine forward operating positions despite heavy PAVN artillery and mortar fire. | 19 March – 19 April 1967 (previously listed as beginning 18 March, which was the last day of Prairie II) | Prairie III: Quang Tri Province; Con Thien vicinity; Leatherneck Square; DMZ area. H Company, 2/5 at the same time: An Hoa and the Nong Son outpost, Quang Nam Province. | Prairie III: Leatherneck Square, Quang Tri Province; Con Thien area; DMZ buffer zone. H Company, 2/5: 2/5 An Hoa TAOR (Nong Son outpost), Quang Nam Province. | Prairie III was a 3d Marine Division operation in Quang Tri Province. The 5th Marines was not part of it. 2/5 was under 1st Marine Division control at An Hoa, Quang Nam Province. | Company H was at An Hoa, not in this operation. From about 1 April 1967 Company H held the Nong Son outpost in the 2/5 TAOR, while the battalion conducted Operation Dixie (7–10 April 1967). Operation as a whole (3d Marine Division): 252 PAVN killed, 4 captured, 128 weapons seized. Marines held forward positions under intense pressure. Confirmed PAVN determination to sustain operations in northern I Corps regardless of casualties. | Whole operation: 56 (all USMC forces). | Whole operation: 530 (all USMC forces). | Whole operation: 252 | Unknown | CORRECTION: H COMPANY DID NOT PARTICIPATE. This file previously listed “elements of 5th Marine Regiment including H Company, 2/5 Marines.” That is wrong. The March and April 1967 command chronologies record 2/5 at An Hoa for both months. Dates corrected: Prairie III began 19 March 1967. |
| Operation New Castle | Search and destroy operation across the Song Thu Bon into the Hanh Tay area. A Company F amphibious raid into Hanh Tay (2) on 20 March was mounted beforehand to mislead the enemy about 2/5's plans. | 220630H – 25 March 1967 (2/5 Command Chronology; previously listed as 21–25 March). Preceded by a deception raid on 20 March. | Hanh Tay (1) and (2), west bank of the Song Thu Bon; Duc Duc District; Quang Nam Province | West bank of the Song Thu Bon; 2/5 An Hoa TAOR; Quang Nam Province | 2/5 with Companies E and F in the field (Companies E, F and H are named in the narrative); LVTP-5s and LVTE-1s; 1st Marine Division air support; Battery E, 2/11 at An Hoa; UH-1E gunships. | Units on New Castle fought NVA/VC troops at close quarters from 23 to 25 March 1967. Five flights of fixed-wing aircraft and UH-1E gunships gave close support, and airborne observers controlled strikes as 2/5 crossed back over the Song Thu Bon. The operation was recorded at 79 enemy KIA confirmed. An official photograph dated 26 March 1967 shows Company F crossing the river by LVT. | Not stated separately in the chronology scan. Breakdown by 2/5 company: not recorded. | Not stated separately in the chronology scan. Breakdown by 2/5 company: not recorded. | 79 KIA confirmed (chronology statistics for New Castle) | Unknown | H COMPANY ROLE UNCERTAIN. The March 1967 chronology's narrative says "Companies E, F and H continued Operation New Castle until its termination." However, its day-by-day activity list for 24 March shows H Company's patrols around its Phu Loc (6) outpost while "E and F continue with Operation Newcastle." H Company held Phu Loc (6) from 16 to 30 March. The likeliest reading is that H Company supported the operation from Phu Loc (6) rather than crossing with the assault companies. Primary source: 2/5 Command Chronology, March 1967 (Texas Tech University Vietnam Archive item 1201048081); USMC official photograph, 26 March 1967. |
| Operation Dixie | Search and destroy operation (2/5 Operation Order 09-67) in the eastern part of the 2/5 TAOR, a heavily mined area south of the Song Thu Bon. | 071000H – 101600H April 1967 | Duy Xuyen and Dien Ban districts, Quang Nam Province. The area was bounded north by the Song Thu Bon, west by north-south grid line 92, south by east-west grid line 48, and east by the eastern limit of the 2/5 TAOR. | Eastern 2/5 TAOR; Duy Xuyen and Dien Ban districts; Quang Nam Province | 2nd Battalion (-)(Rein), 5th Marines (LtCol M.C. Jackson Jr.): Company F (Rein) (Capt J.A. Graham), Company G (Rein) (Capt R.W. Marsden), H&S Company (-) (Capt M.A. Litwin), and a Sparrow Hawk platoon from Company E (GySgt J.L. White); tanks and engineers. | Companies F and G attacked through fortified, mined hamlets; engineers cleared paths for the armor and destroyed many mines in place. Most Marine casualties came from mines and booby traps. The battalion commander recommended no further operations in the area until a mine and booby-trap program had been evaluated. | Not stated in the after action report results section. Breakdown by 2/5 company: not recorded. | 49 WIA evacuated and 5 WIA not evacuated (54 total; battalion). Breakdown by 2/5 company: not recorded. | 8 KIA confirmed, 43 KIA probable; 1 POW | Unknown | CORRECTION: H COMPANY DID NOT PARTICIPATE. The Combat After Action Report for Dixie (2/5 Command Chronology, April 1967) lists Companies F and G, H&S Company and a Company E Sparrow Hawk platoon. It does not list Company H. From 1 April 1967 Hotel Company held the Nong Son outpost in the far southwest of the TAOR. It stayed there through April and May. The report also shows that Capt James A. Graham was commanding Company F by April 1967. Primary source: 2/5 Command Chronology, April 1967, including the Combat After Action Report for Dixie dated 15 April 1967 (Texas Tech University Vietnam Archive item 1201048083). |
| Operation Prairie IV | Two-regiment search and destroy operation to clear PAVN forces from Leatherneck Square; reinforce Con Thien; counter growing enemy threat to Marine strong points along the DMZ. | 20 April – 17 May 1967 | Prairie IV: Leatherneck Square; Con Thien region; Gio Linh; Quang Tri Province; DMZ vicinity. H Company, 2/5 at the same time: Nong Son outpost and An Hoa area, Quang Nam Province. | Prairie IV: Leatherneck Square, northern Quang Tri Province; Con Thien strongpoint; DMZ area. H Company, 2/5: 2/5 An Hoa TAOR (Nong Son outpost), Quang Nam Province. | Prairie IV was a 3d Marine Division operation in Quang Tri Province. The 5th Marines was not part of it; in this period it was committed to Operation Union in Quang Nam and Quang Tin Provinces. | Company H was at the Nong Son outpost in the 2/5 An Hoa TAOR, not in this operation. On 21–22 April 1967 it conducted a two-day search and destroy operation through a fortified VC village at AT 792352; later in April it found and sealed caves in the Nong Son area. It remained at Nong Son during Operation Union in May. Operation as a whole (3d Marine Division): 505 PAVN killed, 9 captured. Heavy USMC casualties in intense fighting. Operation highlighted growing enemy capability to mass forces and employ heavy weapons against Marine positions. Con Thien remained a contested position. | Whole operation: 164 (all USMC forces). | Whole operation: 1,240 (all USMC forces). | Whole operation: 505 | Unknown | CORRECTION: H COMPANY DID NOT PARTICIPATE. This file previously stated that “H/2/5 Marines participated in this two-regiment operation” and listed the 5th Marines among its units. Both are wrong. The April and May 1967 command chronologies record 2/5 at An Hoa for both months. |
| Operation Beaver Cage | Special Landing Force Alpha's part in Operation Union (Union I) in the Que Son Basin, against North Vietnamese 2d Division units. | 28 April – 12 May 1967 | Que Son Basin; Quang Tin / Quang Nam Provinces | Que Son Basin; Quang Tin / Quang Nam Provinces | SLF Alpha (Col James A. Gallo Jr.): BLT 1/3 (LtCol Peter A. Wickwire) and HMM-263, in coordination with the 5th Marines (1/5 and 3/5). Telfer states that during Union the 2/5 guarded the An Hoa industrial complex under 1st Marine Division control. | BLT 1/3 fought 16 days of continuous operations; in one day-long action Companies B and C killed 86 enemy. SLF Alpha units re-embarked on 12 May. | 55 (BLT 1/3). | 151 (BLT 1/3). | 181 VC (previously recorded figure) | Unknown | CORRECTION: H COMPANY DID NOT PARTICIPATE. This file previously said H/2/5 was involved in "coordinated regimental operations." It was not. Telfer's official history states that during Operation Union "the 2d Battalion [5th Marines] guarded the industrial complex at An Hoa." The 2/5 Command Chronologies for April and May 1967 place Hotel Company at the Nong Son outpost for both months. The 55 killed and 151 wounded were BLT 1/3's casualties. Primary source: 2/5 Command Chronologies, April and May 1967 (Texas Tech University Vietnam Archive items 1201048083 and 1201048086); Gary L. Telfer, Lane Rogers and V. Keith Fleming Jr., U.S. |
| Operation Union I | Search and destroy operation against North Vietnamese 2d Division units (3d and 21st NVA Regiments, 3d VC Regiment) that had returned to the Que Son Basin. | Began 21 April 1967 (Telfer); SLF phase (Beaver Cage) 28 April – 12 May; previously listed as 1–16 May 1967 | Que Son Basin; Nui Loc Son; Hill 110; Quang Tin / Quang Nam Provinces | Que Son Basin; Quang Tin / Quang Nam Provinces | 5th Marines (Col Kenneth J. Houghton): 1/5 (LtCol Peter L. Hilgartner) and 3/5, with 1/3 (SLF Alpha, as Beaver Cage). The only 2/5 unit detached was Company E, under 1/1 operational control 15–17 May 1967. | Heavy fighting, including the battle of Hill 110 on 10 May 1967 (1/5 and 1/3). Company H held Nong Son throughout: on 21–22 April it swept a fortified VC village at AT 792352, and later in April it found and sealed large caves in the Nong Son area. | Whole Union I and II: 110 (previously recorded combined figure). Breakdown by 2/5 company: not recorded. | Whole Union I and II: 473 (previously recorded combined figure). Breakdown by 2/5 company: not recorded. | Approximately 865, Union I and II combined (previously recorded figure) | Unknown | CORRECTION: H COMPANY DID NOT PARTICIPATE. This file previously said H/2/5 took part as part of 5th Marines operations in the valley. Telfer's official history states that during Operation Union "the 2d Battalion guarded the industrial complex at An Hoa in the Da Nang TAOR under the operational control of the Commanding General, 1st Marine Division." The 2/5 Command Chronologies place Hotel Company at the Nong Son outpost for all of April and May 1967. Corrected dates: Union began 21 April 1967. Primary source: 2/5 Command Chronologies, April and May 1967 (Texas Tech University Vietnam Archive items 1201048083 and 1201048086); Gary L. Telfer, Lane Rogers and V. Keith Fleming Jr., U.S. |
| Operation Union II | Destroy the 3d and 21st NVA Regiments, which were moving back into the Que Son Basin, with the 6th ARVN Regiment and 1st ARVN Ranger Group (ARVN Lien Ket 106). | 26 May – 5 June 1967 (whole operation). 2/5 participation: Company F from 27 May; battalion command group and Company E, 2–4 June. | Nui Loc Son Basin; Que Son Valley; Vinh Huy village complex (Objective Foxtrot); Quang Tin / Quang Nam Provinces | Southern Que Son Valley / Nui Loc Son Basin | 5th Marines (Col Kenneth J. Houghton): 1/5 (LtCol Peter L. Hilgartner) and 3/5 (LtCol Esslinger, later LtCol Charles B. Webster). On 2 June the division reserve was committed: 2/5 (LtCol Mallett C. Jackson Jr.) with its own Company E, Company D 1/7 and Company E 2/7, inserted northeast of the enemy to drive into the NVA left flank. Company F, 2/5 (Capt James A. Graham) was attached to 1/5 from 27 May. | 26 May: 3/5 landed at LZ Eagle under heavy fire; 118 NVA dead; 3/5 lost 38 killed and 82 wounded. 2 June: at Vinh Huy, Company F, 2/5 was pinned in an open paddy. Capt Graham led an assault on one machine gun, then stayed behind with a wounded Marine and was killed (Medal of Honor). 2/5's commitment on 2 June relieved the pressure; Col Hilgartner said it "saved the day." | Whole operation: 110 (previously recorded figure). Breakdown by 2/5 company: not recorded. | Whole operation: 241 (previously recorded figure). Breakdown by 2/5 company: not recorded. | 701 (previously recorded figure). 2/5's share: 18 KIA confirmed (2/5 June 1967 statistics). | Unknown | CORRECTION: H COMPANY DID NOT PARTICIPATE. This file previously said Companies E and H, 2/5 were inserted to hit the NVA left flank. Telfer's official history names the three companies with 2/5 on 2 June 1967 as "his own Company E; Company D from the 1st Battalion, 7th Marines; and Company E, 2d Battalion, 7th Marines." The 2/5 Command Chronology for May 1967 records that on 27 May "Company F chopped OPCON to 1/5 in conjunction with Operation Union (2). Company H remained at the Nong Son Combat Base." The June chronology says Company E, Company F and the command group took part on 3–4 June. Capt James A. Primary source: 2/5 Command Chronologies, May and June 1967 (Texas Tech University Vietnam Archive items 1201048086 and 1201048089); Gary L. Telfer, Lane Rogers and V. Keith Fleming Jr., U.S. |
| Operation Arizona | 7th Marines search and destroy operation (7th Marines Operation Order; 2/5 Operation Order 20-67). 2/5 held blocking positions on the southeast bank of the Song Thu Bon, then crossed the river and swept its zone to capture or destroy enemy forces and equipment. | 140800H – 181915H June 1967 (2/5 participation; the S-2 lists the operation as 15–19 June); previously listed as 13–26 June | Duc Duc and Dai Loc districts, Quang Nam Province. 2/5's area was the northeastern part of Dai Loc District within the operation area, along the Song Thu Bon; Phu Da (1). | Duc Duc / Dai Loc districts along the Song Thu Bon, Quang Nam Province | Controlling HQ: 7th Marines (Col C.C. Crossfield). 2nd Battalion (-)(Rein), 5th Marines (LtCol M.C. Jackson Jr.): Company E (Rein) (Capt P.J. Blessing), Company H (Rein) (Capt R.W. Layer Jr.), provisional platoon of H&S Company (Capt K.A. Magyar), 3d Platoon Company A 3d Amtrac Battalion, Ontos and Army searchlight jeeps. Company F, 2/5 was attached to 3/7. | On the night of 13 June, Company H left An Hoa one platoon at a time to occupy regimental blocking positions 13–15 on the east bank of the Song Thu Bon. It then moved along the bank to the crossing site, with Company E following. Contact was light. Company H made one emergency and one priority medevac (7 Marines evacuated) and needed two resupply runs. | Not stated (light contact). Breakdown by 2/5 company: not recorded. | Company H: 7 Marines medevaced (wounded, injured and heat). Battalion total not stated. | 2 VC KIA confirmed; 3 VC POWs | Unknown; 33 detainees and 14 refugees | CONFIRMED H COMPANY PARTICIPATION. The 2/5 Command Chronology for June 1967 records that "On 14 June, Company E, Company H and Command Group chopped OPCON to the 7th Marines for Operation Arizona and remained under the 7th Marines control until 18 June." The attached Combat After Action Report (21 June 1967) lists Company H (Rein) under Capt R.W. Layer Jr. Corrected dates: 2/5 took part 14–18 June 1967. Arizona was a 7th Marines operation, not a 5th Marines one. Primary source: 2/5 Command Chronology, June 1967, including the Combat After Action Report for Arizona dated 21 June 1967 and 2/5 Operation Order 20-67 (Texas Tech University Vietnam Archive item 1201048089). |
| Operation Calhoun | 1st Marine Division search and destroy operation (2/5 Operation Order 22- 67) against enemy Base Area 116, south of Nong Son, where battalion-size enemy units were reported to be building a base area. | 250600H – 291900H June 1967 (2/5 after action report; previously listed as 25 June – 1 July) | Duc Duc District, Quang Nam Province; northwestern sector of the division area of operations; Base Area 116, south of Nong Son (vicinity ZC 1835) | Duc Duc District; Base Area 116; Quang Nam Province | Controlling HQ: 1st Marine Division (MajGen D.J. Robertson). 2nd Battalion (-)(Rein), 5th Marines (LtCol M.C. Jackson Jr.): Company F (Rein), Company G (Rein) (Capt R.W. Marsden), 6th Platoon 1st Force Reconnaissance Battalion, artillery forward observer teams from Battery E 2/11, and 5th Marines scout-sniper teams. | The battalion attacked into Base Area 116. The S-2 recorded light enemy contact. Company E took over the Nong Son Combat Base on 23 June so that F and G could be committed. The Special Landing Force operation Beacon Torch/Calhoun (BLT 2/3, 18 June – 2 July) was a separate SLF action. | Not stated (light). Breakdown by 2/5 company: not recorded. | Not recorded. | 2 KIA confirmed (2/5 statistics for Calhoun) | Unknown | CORRECTION: H COMPANY DID NOT PARTICIPATE. The 2/5 Command Chronology for June 1967 records: "On 25 June, Company F, Company G and Command Group commenced Operation Calhoun." The attached Combat After Action Report (4 July 1967) lists only Companies F and G. Hotel Company had just come out of Operation Arizona (14–18 June). The earlier note linking 2/5's Calhoun to Beacon Torch/Calhoun mixed in a separate Special Landing Force operation by BLT 2/3. Primary source: 2/5 Command Chronology, June 1967, including the Combat After Action Report for Calhoun dated 4 July 1967 (Texas Tech University Vietnam Archive item 1201048089); Gary L. Telfer, Lane Rogers and V. Keith Fleming Jr., U.S. |
| Operation Pike | 1st Marines box-and-sweep operation against VC around Hoi An. | Early August 1967 (Telfer); previously listed as 1–3 August (the broader operation is often given as 1–18 August) | Hoi An area; Quang Nam Province | Hoi An area; Quang Nam Province | 1st Marines (Col Herbert E. Ing): 1/1 (LtCol George E. Petro) and 3/5 (LtCol Charles B. Webster). | Previously recorded results: about 100 enemy killed, 4 captured and 54 detained over the broader operation period. | Whole operation: 8 (previously recorded figure). | Whole operation: 60 (previously recorded figure). | Approximately 100 (previously recorded figure) | Unknown | CORRECTION: H COMPANY AND 2/5 DID NOT PARTICIPATE. Telfer's official history describes Pike as a 1st Marines operation carried out by 1/1 and 3/5. Neither the 2/5 Command Chronology for July 1967 nor the one for August 1967 mentions Pike. The August chronology places Hotel Company around the Nong Son outpost, south of An Hoa. Primary source: 2/5 Command Chronologies, July and August 1967 (Texas Tech University Vietnam Archive items 1201048090 and 1201048091); Gary L. Telfer, Lane Rogers and V. Keith Fleming Jr., U.S. |
| Operation Swift (Lam Son 289-B) | Relieve Marine companies under heavy North Vietnamese attack near Dong Son and pursue and destroy North Vietnamese 2d Division units in the Que Son Valley. | 4–15 September 1967 | Que Son Valley; Dong Son (2); Chau Lam (1); Hill 43; Que Son District; Quang Tin / Quang Nam Provinces | Que Son Valley, Quang Tin / Quang Nam Provinces | 5th Marines: 1/5 and 3/5 were the main battalions. Company H, 2/5 (Capt Gene W. Bowers) was placed under 5th Marines operational control for Swift and served under 3/5; Company M, 3/5 reinforced it on 10 September. | 10 September: northeast of Hill 43, Company H found a village fortified with bunkers, trenches and wire, empty except for women and children, and moved on. While it was being resupplied, its 3d Platoon (2ndLt Allan J. Herman) walked back into the village. A reinforced North Vietnamese company had reoccupied it and opened fire with .50-caliber machine guns and 60mm mortars; Lt Herman was killed trying to rescue a wounded Marine. Capt Bowers sent the 2d Platoon to the left to cut off the enemy's escape and led the 1st Platoon forward. Artillery, gunships, air strikes and tear gas were brought in, and Company H and Company M, 3/5 assaulted and took the village. | Whole operation: 127 (previously recorded figure). Company H, 10 September: 9 Marines killed, 6 of them in the rice paddies in front of the enemy positions. | Whole operation: 362 (previously recorded figure). Breakdown by 2/5 company: not recorded. | Company H action, 10 September: 40 NVA dead counted. Whole operation: approximately 600 (previously recorded figure). | Unknown | CONFIRMED H COMPANY ENGAGEMENT (not merely supporting). This file previously described H Company's role as supporting or follow-on. The 2/5 Command Chronology for September 1967 records: "Company H was chopped to OpCon of 5th Marines for participation in Operation Swift... On several occasions Company H engaged in close combat with crack NVA forces and inflicted maximum enemy casualties." Telfer's official history gives the 10 September fight northeast of Hill 43 in detail. Capt Gene W. Bowers commanded Hotel Company for the whole of September 1967 (September roster: Capt G.W. Primary source: 2/5 Command Chronology, September 1967 (Texas Tech University Vietnam Archive item 1201048092); Gary L. Telfer, Lane Rogers and V. Keith Fleming Jr., U.S. Marines in Vietnam: Fighting the North Vietnamese, 1967 (HQMC, 1984), pp. 117–118. |
| Operation Shelbyville | Company H, 2/5 was ordered by the Commanding Officer, 2/5 to move into blocking positions in support of Operation Shelbyville. The chronology does not name the unit conducting the sweep or the headquarters controlling the operation. | 26–29 September 1967 (the dates Company H, 2/5 was committed; the 2/5 Command Chronology records only the battalion’s part, not the start and end of the operation as a whole). | Grid squares AT9653 and AT9652, east of the An Hoa Combat Base and north of the Phu Loc (6) position, Duc Duc District, Quang Nam Province, I Corps. | Quang Nam Province, I Corps; the An Hoa – Phu Loc (6) area of the 2/5 TAOR. | 2nd Battalion, 5th Marines (LtCol G.C. McNaughton); Company H (Capt G.W. Bowers). The chronology names no other 2/5 company in this operation. | On 26 September Company H was ordered to move to the vicinity of grid squares AT9653 and AT9652 to act as a blocking force. While moving into position at AT 953525 the company came under an estimated 20 rounds of automatic fire from an unknown number of Viet Cong at AT 957525 and AT 957526. While manoeuvring toward the enemy the company tripped two booby traps of an estimated 105mm size. Forced to curtail its movement, the company pursued the enemy by fire while medical evacuations were called in, and the enemy broke contact while the evacuation was being completed. Company H remained in blocking positions until 29 September. | 2 killed (Company H, 26 September 1967). | 7 wounded and evacuated (Company H, 26 September 1967). | 2 Viet Cong killed, probable. | Not recorded. | This operation had no file in this series until now. It is a genuine Hotel Company action: the September 1967 chronology records twice that Company H took part in Operation Shelbyville as a blocking force, and it cost the company 2 killed and 7 wounded on 26 September. CAUTION ON SCOPE: the 2/5 chronology documents only 2/5’s own part. It does not say which headquarters ran Shelbyville, which unit it supported, how long the operation lasted outside 26–29 September, or what the overall results were. Primary source: 2/5 Command Chronology, September 1967, Part II narrative paragraph 12 and the significant events entry for 26 September (S:\Hotel25\Hotel25\Combat Operations\Battalion Chronologies\1967\1967September-2- 5CommandChronology.pdf). |
| Operation Golden Fleece | Protect Vietnamese farmers bringing in the rice harvest and deny the crop to the Viet Cong. | 30 September 1967 is the only date on which the 2/5 Command Chronology records the battalion taking part. Golden Fleece was not a single operation: III MAF used the name repeatedly from 1965 onward for rice-harvest protection operations across I Corps. | Phu Da (1) area, Duc Duc District, Quang Nam Province, I Corps. | Quang Nam Province, I Corps; the An Hoa area of the 2/5 TAOR. | 2nd Battalion, 5th Marines (LtCol G.C. McNaughton) with Company E and Company G. | Company E and Company G participated in Golden Fleece operations in the Phu Da (1) area on 30 September 1967. While protecting the Vietnamese farmers, squad-sized units conducted extensive “hole finding” operations. The chronology records no casualties on either side for this activity. | Not recorded for this activity. | Not recorded for this activity. | None recorded for this activity. | None recorded for this activity. | This file exists because Companies E and G are named in a Golden Fleece operation and the series had no file for it. CAUTION ON SCOPE: this is the only Golden Fleece entry found in any 2/5 command chronology from 1966 to February 1971, and it is a single sentence covering a single day. Golden Fleece was a recurring III MAF rice-protection effort rather than one discrete operation, so 2/5 may well have taken part on other occasions that its chronologies record under other wording, such as “rice harvest security”. Primary source: 2/5 Command Chronology, September 1967, Part II narrative paragraph 13 (S:\Hotel25\Hotel25\Combat Operations\Battalion Chronologies\1967\1967September-2-5CommandChronology.pdf). |
| Operation Essex | Search and destroy in Antenna Valley (Hiep Duc District south of An Hoa) as continuation of Op Swift. Push PAVN/VC into US Army Op Wheeler/Wallowa; locate and destroy PAVN units. | 6–17 Nov 1967 | Antenna Valley; Hiep Duc District; south of An Hoa Combat Base; Quang Nam Province | Antenna Valley; Hiep Duc District; south of An Hoa FSB; Quang Nam Province | 2nd Battalion, 5th Marines (LtCol George C. McNaughton) with four rifle companies, including Company H (Capt Gene W. Bowers) and Company F (Capt Edward J. "Buck" Byer Jr.). Company F had originally been kept back as the rapid reaction force. | 6 November: after landing by helicopter, Company H advanced on Ap Bon (2) and met a large enemy force in the village. Its 2d Platoon (2ndLt Duane V. Sherin) ran into more NVA in the brush to the west and lost two killed. After air and artillery strikes, the 1st and 3d Platoons assaulted but were stopped by eight strands of barbed wire hidden in bamboo, with .50-caliber machine guns firing along the wire from both flanks under mortar fire. 2ndLt Robert W. Miller Jr. was killed and both platoon sergeants badly wounded. Company F arrived about 1600 and assaulted with Company H as its base of fire; it was also repulsed. The two companies pulled back 70 meters under AC-130 cover. | 16 killed at Ap Bon (2), H and F Companies (Telfer). Breakdown by 2/5 company: not recorded. | 53 serious casualties including the 16 dead (H and F Companies at Ap Bon (2)). Breakdown by 2/5 company: not recorded. | Operation total: 65 NVA KIA confirmed, 125 NVA KIA probable, 7 VC KIA confirmed, 40 VC KIA probable | Unknown; 2 NVA and 1 VC POWs; 15 detainees; 266 refugees | CONFIRMED H COMPANY ENGAGEMENT. H Company ambushed 6 Nov at Ap Bon 2. Captured officer cadet intelligence led to destruction of PAVN battalion HQ. Sources: Military-History Fandom — Op Essex; combatwife.net; USMC Command Chronologies. |
| Operation Auburn | 5th Marines spoiling attack on Go Noi Island against the R-20th and V-25th local force battalions, in coordination with ARVN battalions sweeping Route 537 and 1st Cavalry Division units to the south. | 28 December 1967 – 3 January 1968 (whole operation). 2/5 companies took part 29–30 December 1967. | Go Noi Island; LZ Hawk; Bao An Dong; Quang Nam Province, about 25 km south of Da Nang | Go Noi Island; Quang Nam Province | 5th Marines (Col Robert D. Bohn); field command LtCol William K. Rockey (3/5). Initial force of four companies: Company E 2/3 (Capt Ian J. Cahill, Australian Army), Company I 3/5, and Companies E and G of 2/5, which were placed under 3/5 control. The 2/5 command group went to LZ Hawk. Supported by 2/11 and MAG-16. | 28 Dec: Company E, 2/3 landed at LZ Hawk at 0904 under fire and ran into a fortified hamlet in Bao An Dong. 29–30 Dec: Companies E and G of 2/5 took their objective and secured the regimental CP near LZ Hawk. At 1500 on 30 December the 2/5 CP returned to An Hoa and secured from Auburn, leaving E and G under 3/5. | Whole operation: 23 (previously recorded figure). 2/5 portion: 3 WIA evacuated, 1 minor; no KIA stated. Breakdown by 2/5 company: not recorded. | Whole operation: 60 (previously recorded figure). Breakdown by 2/5 company: not recorded. | Whole operation: 37 (previously recorded figure). 2/5 portion: 6 VC KIA probable, 2 detainees. | Unknown | CORRECTION: H COMPANY DID NOT PARTICIPATE. 2/5 did take part, but with Companies E and G only. The 2/5 Command Chronology for December 1967 records Companies E and G placed under 5th Marines and 3/5 control for Auburn on 29–30 December, while the command group went out and returned. The January 1968 chronology records the command group moving from LZ Hawk back to An Hoa at 301500H. Hotel Company was at An Hoa: on 28 December an H Company Marine set off a booby trap near the base, wounding two. Primary source: 2/5 Command Chronologies, December 1967 and January 1968 (Part 2) (Texas Tech University Vietnam Archive items 1201048096 and 1201048098); Jack Shulimson et al., U.S. Marines in Vietnam: The Defining Year, 1968 (HQMC, 1997), ch. 6, pp. |
| Operation Hue City (Battle of Hue) | Retake Hue City from NVA/VC forces that seized it during Tet Offensive; clear southern Hue (New City); protect MACV compound. Most violent urban combat of Vietnam War. Official USMC designation: Operation Hue City. | 1 Feb – 2 Mar 1968 | Hue City; Thua Thien Province; MACV Compound; southern Hue (New City); Highway 1; Perfume River | Hue City; Thua Thien Province; southern sector (New City) south of Perfume River | Task Force X-Ray (BGen Foster C. LaHue). 2nd Battalion, 5th Marines (LtCol Ernest C. Cheatham Jr.): Company H (Capt G. Ronald Christmas), Company F (Capt Michael P. Downs, initially with 1/1), Company G and Company E. 1st Battalion, 1st Marines (LtCol Marcus J. Gravel); 1/5 (Citadel); ARVN 1st Division. | 31 Jan: at the Truoi River Bridge, south of Hue, Cheatham sent Capt Christmas's Company H to relieve Combined Action Platoon H-8, reinforced by the command group and Company F. 2/5 killed 18 enemy and took 1 prisoner, losing 3 killed and 13 wounded. 2 Feb, about 1100: Company H crossed the An Cuu Bridge into Hue in a "Rough Rider" armed convoy with Army quad-.50 trucks and Ontos, fought through fire near the MACV compound, and joined 1/1 by mid-day. 4 Feb, from 0700: Company H blasted through walls and courtyards with 3.5-inch rockets and 106mm recoilless rifles, captured the public health building, and covered Company F's assault on the Treasury; | Whole battle: 147 USMC KIA (previously recorded figure). 2/5 at Truoi River, 31 Jan: 3 KIA. Breakdown by 2/5 company: not recorded. | Whole battle: 857 USMC WIA (previously recorded figure). 2/5 for February 1968: 421 WIA (chronology). Breakdown by 2/5 company: not recorded. | 2/5 for February 1968: 717 NVA/VC KIA confirmed (chronology statistics). Whole battle: approximately 5,000 in the Hue area (previously recorded figure). | Unknown | CONFIRMED MAJOR H COMPANY ENGAGEMENT. Capt Ron Christmas commanded H Company. H Company fought through ambushes to relieve MACV. Official USMC designation is 'Operation Hue City.' Sources: Marine Corps History Division; Eric Hammel, 'Fire in the Streets'; Wikipedia. A one-page summary of this operation is also available: Operation Hue City — Summary. |
| Operation Houston | Reopen and secure Route 1 between Da Nang and Phu Bai closed since Tet Offensive. PAVN/VC had destroyed 20 bridges and 26 culverts. Task Force X-Ray (built around 5th Marines) tasked to clear and hold critical highway. | 26 Feb – 12 Sep 1968 | Thua Thien Province; Route 1 corridor Da Nang to Phu Bai; Phu Loc District; Hai Van Pass sector | Thua Thien Province; Route 1 corridor; Da Nang to Phu Bai; Hai Van Pass | 5th Marines (Col Robert D. Bohn), Task Force X-Ray; 1/5; 2/5 (LtCol Ernest C. Cheatham Jr.) with Companies E, F, G and H; 2/3 and Army battalions early in the operation; 2/11 artillery. | About 10 March, the 2/5 CP and Companies G and H moved from Hue to Cao Doi. G took over security of the Truoi River Bridge and H moved to the Rock Crusher area. On 12 March the command group and Companies E, H and G (-) began a 7-day search and destroy operation in the hills and jungle, the battalion's first field operation after a month of street fighting. From 18 March 2/5 pushed into the rugged Bach Ma area and kept a platoon outpost on Bach Ma until 17 April. Second phase (May–July, battalion at Cao Doi, then Phu Gia from 17 May): security of Route 1 in the southern half of the regimental area using squad and fire-team ambushes, patrols and outposts. | Whole operation: 117 (previously recorded figure). 2/5 and. Breakdown by 2/5 company: not recorded. | Not recorded. | Whole operation: 702 VC/NVA (previously recorded figure) | Unknown; 29 captured (previously recorded figure) | CONFIRMED 2/5 Marines operation. Six-month highway security operation. Multiple 5th Marine battalions rotated through. Sources: Wikipedia — Operation Houston; Marine Corps Operations in Vietnam 1968 (USNI Proceedings). |
| Operation Baxter Garden (Lam Son) | Harvest security and S&D operation 8 km east of Hue on Phu Thu peninsula. Protect civilian rice harvest from VC appropriation; search for and destroy PAVN/VC forces in Thua Thien Province east of Hue. | 19–26 Apr 1968 | Phu Thu peninsula; 8 km east of Hue; Thua Thien Province; I Corps | Phu Thu peninsula; 8 km east of Hue; Thua Thien Province | 2nd Battalion (-)(Rein), 5th Marines: Company E (19 Apr 0800 – 26 Apr 1200), Company H (190800H – 222000H, then 222000H – 261200H), H&S Company; Company B 1/5; Companies C and D 1/27; tanks, anti-tank and amtrac elements attached 21 April; two ARVN battalions in support. | 19 Apr: at 1200 Company H attacked Objective #5 and set up night positions on Objective #6; Company E killed 4 NVA in a contact at YD 850231. 20 Apr: an Company H platoon patrol took about 1,000 rounds of fire from 10–15 enemy at YD 863204; Company H platoons began hitting booby traps on gates, bridges and paddy dikes. 21 Apr: Company H moved to Objectives #4 and #12 and crossed Phase Line Green; a platoon hit two mines. 22 Apr, 0435: an Company H Marine set off a booby-trapped grenade at YD 901233 (7 WIA evacuated, 1 not evacuated), and more booby traps followed during the attack toward Phase Line Apple. Most Marine casualties came from mines and booby traps. | Whole operation: 13 (Shulimson). Company B 1/5, 20 Apr: 8 KIA. | Whole operation: 125 (Shulimson). Company H: at least 15 WIA from booby traps on 20–22 April (journal). | Shulimson: 55. 2/5 after action report: 49 NVA/VC KIA confirmed. | Unknown; 11 detainees; captured 6 AK-47s, 4 SKS, 2,500 lb rice | CONFIRMED 2/5 Marines operation. 2/5 Marines accompanied by 2 ARVN battalions. Part of spring 1968 Thua Thien Province follow-up ops. Sources: 1968 in the Vietnam War — Wikipedia; USMC Command Chronologies. |
| Operation Allen Brook | Sweep and clear Go Noi Island and nearby areas south of Da Nang of VC and North Vietnamese forces; later land clearing to deny the enemy the island. | 4 May – 24 August 1968 | Go Noi Island; Le Nam (1); Bac Dong Ban; Quang Nam Province, about 25 km south of Da Nang | Go Noi Island area; Quang Nam Province | Units named in Shulimson's account include BLT 2/7, 3/7, 1/26, 3/27 and 2/27, under the 7th and 27th Marines. 2/5 was in Operation Houston in Thua Thien Province until late July 1968. | Previously recorded results: 917 enemy killed and 11 captured; enemy units displaced from Go Noi Island but returned after the Marines withdrew. | Whole operation: 172 (previously recorded figure). | Whole operation: 1,124 (previously recorded figure). | 917 (previously recorded figure) | Unknown | CORRECTION: H COMPANY DID NOT PARTICIPATE. This file previously said H/2/5 "rotated through Go Noi Island and Dodge City" during Allen Brook. The 2/5 Command Chronologies place the battalion in Thua Thien Province for all of May, June and most of July 1968: at Cao Doi from 1 to 16 May, then Phu Gia, on Route 1 security in Operation Houston. 2/5 entered the Go Noi – An Hoa area on 28 July 1968 in Operation Mameluke Thrust. The "Companies E, F and H" mortared on Go Noi on 23 June 1968 in Shulimson's account belonged to 2/27, not 2/5. Primary source: 2/5 Command Chronologies, May–July 1968 (Texas Tech University Vietnam Archive items 1201048103– 1201048105); Jack Shulimson et al., U.S. Marines in Vietnam: The Defining Year, 1968 (HQMC, 1997). |
| Operation Mameluke Thrust | Spoiling attack and S&D in Happy Valley and Arizona Territory SW of Da Nang; disrupt PAVN plans for second Tet-style offensive; destroy enemy base camps and logistics. | 19 May – 23 Oct 1968 | Happy Valley; Arizona Territory; Quang Nam Province; An Hoa area; SW Da Nang | Happy Valley and Arizona Territory; western Quang Nam Province; An Hoa area; Charlie Ridge | 5th Marines. 2nd Battalion (Rein), 5th Marines: Maj O.K. Steele (28–31 Jul), LtCol James W. Stemple (1 Aug – 23 Oct). Company E: 2ndLt P.R. McConnell, then Capt J.A. Woggon Jr. Company F: 1stLt T.D. Martin, then Capt D.B. Brown. Company G: Capt H.J. Poole. Company H: 1stLt S.R. Brown (28–30 Jul), then Capt P.A. Vanderberg (1 Aug – 23 Oct). 3/5, BLT 2/7 and 2/11 artillery. | The battalion normally kept one company at Phu Loc (6), one at An Hoa, and the rest on search and destroy operations. It fought frequent close actions at the fortified Phu Nhuan and Cu Ban village complexes south of the Song Thu Bon and spent much effort destroying enemy fortifications. 6 Aug: a misdirected air strike dropped canisters on the 3d Platoon, Company F; 26 Marines were burned. From 17 August 2/5 joined BLT 2/7 and 3/5 at Chau Phong. On 18 August Company G, 2/5 took La Thap (1) in a five-hour fight, killing 37 NVA and losing 7 killed and 19 wounded. 30–31 Aug: Company H's ambushes on the Song Ky Lam belong to Operation Sussex Bay (see that file). | Whole operation: 269 (previously recorded figure). Breakdown by 2/5 company: not recorded. | Whole operation: 1,730 (previously recorded figure). Breakdown by 2/5 company: not recorded. | Whole operation: 2,730 killed, 47 prisoners, 8 ralliers (Shulimson) | Unknown | Extended 5-month operation. H/2/5 operated from An Hoa Combat Base throughout this period. Sources: Marine Corps History Division. |
| Operation Sussex Bay | 1st Marine Division operation to block the withdrawal of North Vietnamese and VC forces from the Da Nang area after their failed August 1968 offensive, and destroy them in detail as they tried to reach Go Noi Island. | 29 August – 9 September 1968 (H-hour 0900, 29 August) | Go Noi Island; Song Ky Lam; Dodge City; National Railroad; Liberty Bridge; Quang Nam Province | Go Noi Island and Song Ky Lam; Quang Nam Province | 5th and 7th Marines with ARVN 21st and 37th Ranger Battalions and Korean Marines. 3/5 blocked the western half of Go Noi Island along the Song Ky Lam; 2/5 (LtCol James W. Stemple) swept the eastern half. 3/7 held a line west of the railroad; Korean Marines blocked along the Co Ca stream. | 30 Aug, just after midnight: Company H ambushed about 30 North Vietnamese fording the Song Ky Lam toward Go Noi Island; 29 enemy dead were found at first light, with no Marine casualties. 31 Aug, 2000: Company H ambushed a second group of about 30 NVA crossing the river in boats; under 81mm illumination it sank both boats with small-arms fire. 5–6 Sep: Typhoon Bess struck while 2/5 was at the far east end of the island. The battalion was lifted out by helicopter on 6 September except Company H, which was to stay under 5th Marines control and sweep back to Liberty Bridge. LtCol Stemple had Company H lifted out after one of its Marines drowned. | Whole operation: not available. Company H: 1 Marine drowned during Typhoon Bess (6 Sep); no casualties in the 30 August ambush. | Not recorded. | Company H, 30 Aug: 29 NVA dead; 31 Aug: two boatloads sunk. Whole operation: not available (ARVN Rangers reported more than 80 NVA dead on 31 Aug). | Unknown | CONFIRMED H COMPANY ENGAGEMENT. CORRECTION: this file previously described Sussex Bay as a vehicle recovery operation. Shulimson's official history shows it was a blocking operation against enemy forces withdrawing after the August 1968 attacks on Da Nang. H Company's two night ambushes on the Song Ky Lam (29 NVA dead on 30 August, and two boats sunk on 31 August) are among its best-documented actions. The recovery of the tanks and amtracs left on Go Noi during Typhoon Bess came afterward. The 1st Marine Division ended the operation on 9 September because of the typhoon. Primary source: Jack Shulimson et al., U.S. Marines in Vietnam: The Defining Year, 1968 (HQMC, 1997), pp. 381–384 (citing 1st MarDiv and 5th Marines records); 2/5 Command Chronology, September 1968 (Texas Tech University Vietnam Archive item 1201048107). |
| Operation Maui Peak | Relieve the North Vietnamese pressure on the Thuong Duc Special Forces Camp. 2/5 (-) occupied Fire Support Base Hill 52, then attacked west along Route 4 in a diversionary attack that became a major fight with the 1st Battalion, 141st NVA Regiment. | 060600H – 191800H October 1968 (2/5 after action report). 2/5 (-) was under 7th Marines control 1–19 October. | Thuong Duc District, Quang Nam Province; Route 4; Hill 52; Hill 65; Song Vu Gia; LZ Sparrow | Thuong Duc corridor along Route 4; Quang Nam Province | 7th Marines (Col Herbert L. Beckington). 2nd Battalion (-)(Rein), 5th Marines (LtCol James W. Stemple): H&S Company, Company E 2/5 (Capt J.A. Woggon Jr.), Company G 2/5 (Capt R.J. Poole), Company A 1/5 (Capt R.L. Cody; 1stLt S.A. Nelson from 8 Oct), Company L 3/7 (Capt G. Oberndorfer, from 9 Oct). Also 3/5, BLT 2/7 and 1/1; 3/11, 2/11 and Army 175mm guns; B-52 and tactical air. | 6 Oct: Company G took a hill at ZC 198559 on its third assault (2 KIA, 16 WIA, 9 NVA KIA). 7 Oct: Company A (1/5) was repulsed from an entrenched hill (12 WIA; 42 NVA reported killed). 8 Oct: Company E, with four tanks, took the hill at ZC 190561 (1 KIA, 9 WIA, 37 NVA dead). 12 Oct, 0400: after about 40 rounds of 82mm fire, an NVA company attacked Company E's night position; Company E held with more than 1,000 rounds of artillery, air strikes and AC-47 gunships, losing 8 killed and 20 wounded against 46 NVA killed and 1 captured. On 14 October a BLT 2/7 company entered the Thuong Duc camp, lifting the siege. | Whole operation: 28 (previously recorded figure). Company E, 2/5, 12 Oct: 8 KIA. | Whole operation: 143 (previously recorded figure). Breakdown by 2/5 company: not recorded. | Whole operation: 202 (previously recorded figure); 46 in the 12 October attack on Company E | Unknown; 1 POW (12 Oct) | CORRECTION: H COMPANY DID NOT PARTICIPATE, AND CAPT DREZ WAS NOT H COMPANY'S COMMANDER. The 2/5 Combat After Action Report for Maui Peak (25 October 1968) lists H&S Company, Companies E and G of 2/5, Company A 1/5 and Company L 3/7. It does not list Company H. The 12 October 1968 pre-dawn attack (8 Marines killed, 46 NVA killed) was on Company E, not Company H. The 2/5 Command Chronology for October 1968 shows Capt Ronald J. Drez as S-3A (assistant operations officer) from 1 to 29 October. He took command of Company H on 30 October 1968, after the operation. Capt P.A. Primary source: 2/5 Command Chronology, October 1968, including the Combat After Action Report for Maui Peak dated 25 October 1968 (Texas Tech University Vietnam Archive item 1201048108); Jack Shulimson et al., U.S. |
| Operation Henderson Hill | Investigate and interdict PAVN 90th Regiment infiltration routes; clear Happy Valley and Arizona Territory; respond to intelligence on major enemy offensive preparations. | 23 Oct – 6 Dec 1968 | Happy Valley; Arizona Territory; An Hoa sector; Go Noi Island periphery; Quang Nam Province | Happy Valley and Arizona Territory; An Hoa area; Quang Nam Province | 5th Marines. 2nd Battalion, 5th Marines (LtCol James W. Stemple) with Companies E, F, G and H (Capt P.A. Vanderberg to 29 Oct; Capt Ronald J. Drez from 30 Oct); 3rd Battalion, 5th Marines. | 23 Oct: the 2/5 command group and two companies were patrolling east of Liberty Road when ordered to disengage. They trucked to An Hoa, met MajGen Youngdale, and made a helicopter assault into the Arizona Territory; small-arms fire closed the primary landing zone, but the battalion reached its objectives before nightfall. In sweeps over the following days 2/5 and 3/5 had little contact but captured a 24-page enemy document laying out the "Winter-Spring 1968–69 Campaign." Late October: an Company H platoon securing amtracs was hit by small-arms fire and grenades, and an Company H Marine set off a booby-trapped grenade at AT 949499. | Whole operation: 35 (previously recorded figure). Breakdown by 2/5 company: not recorded. | Not recorded. | Whole operation: 700 (previously recorded figure) | Unknown; 94 captured (previously recorded figure) | CONFIRMED 2/5 Marines operation. Discovery of 24-page enemy campaign planning document was significant intelligence find. Sources: USMC Command Chronologies; Marine Corps History Division. |
| Operation Meade River | Massive cordon and search against VC/PAVN stronghold in Dodge City. Seven Marine battalions to cordon 36 sq km and systematically search and destroy all enemy forces inside. | 20 Nov – 9 Dec 1968 | Dodge City area; 36 sq km cordon; Quang Nam Province; ~12 km south of Da Nang | Dodge City area; S Quang Nam Province; 36 sq km cordon south of Da Nang | 1st Marines (Col Robert G. Lauffer), controlling. 2nd Battalion (Rein), 5th Marines (LtCol James W. Stemple): Company E (Capt J.A. Woggon Jr.), Company F (Capt D.B. Brown), Company G (Capt H.J. Poole), Company H (Capt Ronald J. Drez), Company A 1/7 (Capt James F. Foster, 28 Nov – 6 Dec). BLT 2/26, 3/26 (LtCol J.W.P. Robertson), 3/5, 1/1, BLT 2/7; 51st ARVN Regiment; 2d Troop, 4th ARVN Cavalry. | 28 Nov (Thanksgiving): BLT 2/26 and 2/5 reached the Suoi Co Ca on the eastern side of the cordon. 6 Dec: as 2/5 waited to be lifted back to An Hoa after 15 quiet days, LtCol Stemple told Capt Drez at 1400 that Company H would instead make a helicopter assault under 3/26 control, with the lift starting in five minutes. Company H was set down less than 1,000 meters away, on the western side of the Suoi Co Ca. 7 Dec: 3/26 swung into the Northern Bunker Complex pivoting on Company H. Company H and A/1/7 attacked frontally; Company H was hit from two pagodas in a flooded cemetery, 10 Marines of the two companies were killed and 23 wounded, and volunteers brought in the dead after dark. | Whole operation: 108 (Shulimson). 7 Dec, Company H and A/1/7 together: 10 KIA. | Whole operation: 510 (Shulimson). 7 Dec, Company H and A/1/7 together: 23 WIA. | Whole operation: 1,023 (Shulimson). Company H's bunker assault, 8 Dec: 39 enemy dead reported. | Unknown; whole operation: 123 prisoners, 6 ralliers, 2,663 civilians screened, 71 VC infrastructure members identified | CONFIRMED H COMPANY ENGAGEMENT. Largest cordon op of Vietnam War. Capt Ron Drez received Bronze Star. 2/5 and 2/26 held northern boundary; heavy contact 1445 hrs documented. Sources: USMC Command Chronologies. |
| Operation Taylor Common | Search and destroy Base Area 112 — major PAVN/VC base supporting 21st Regiment, 68B Rocket Regt, 141st Regt, and command units. Task Force Yankee formed to secure An Hoa Basin and construct FSBs to project power west. Medal of Honor: LCpl William R. Prom. | 6 Dec 1968 – 8 Mar 1969 | An Hoa Basin; Base Area 112; Arizona Territory; SW Quang Nam Province; mountain FSBs west of An Hoa | Base Area 112 and surrounding mountains SW of An Hoa; Arizona Territory; Quang Nam Province | Task Force Yankee (BGen Ross T. Dwyer). 2nd Battalion, 5th Marines (LtCol James W. Stemple), under 3d Marines control (Col Michael M. Spark) in January 1969, with Companies E, F, G and H (Capt Ronald J. Drez, to 7 March 1969); 1/3, 3/3, 3/5; 1st ARVN Ranger Group; 11th Marines and 4/13 artillery. | 13 Dec 1968: a Company E platoon and engineers rappelled onto Hill 214, and by evening 2/5 had landed and was building FSB Pike, without opposition. January 1969: three companies patrolled the Ong Thu Slope while one secured and improved Pike. Contact came mostly from chance meetings, but the battalion kept uncovering enemy base camps and supply points. 23 Jan: ordered to close FSB Pike. 21 Feb: after three days' rest at An Hoa, 2/5 trucked to Phu Loc (6) and set up blocking positions with the 1st ARVN Ranger Group and Regional Forces for the ARVN sweep of western Go Noi Island. | Whole operation: 183 (previously recorded figure). 2/5 in January 1969: 7 KIA (chronology). Breakdown by 2/5 company: not recorded. | Whole operation: 1,487 (previously recorded figure). Breakdown by 2/5 company: not recorded. | Whole operation: 1,398 (previously recorded figure) | Unknown | CONFIRMED MAJOR H COMPANY ENGAGEMENT. Capt Ron Drez commanded H Company; committed 13 Dec 1968. Hotel Company earned Vietnam Cross of Gallantry with Silver Star and PUC. Medal of Honor: LCpl William R. Prom. Sources: Wikipedia — Op Taylor Common; hotel25vv.com; '2-5 Military Operations Vietnam'. |
| Operation Oklahoma Hills | Clear North Vietnamese base camps and infiltration routes in the Charlie Ridge and Happy Valley areas southwest of Da Nang (previously recorded description). | 31 March – 29 May 1969 | Charlie Ridge; Happy Valley; southwestern Quang Nam Province | Charlie Ridge and Happy Valley; Quang Nam Province | 7th Marines (Col Robert L. Nichols) with its own battalions, 3/26 (LtCol Edward W. Snelling) and the 51st ARVN Regiment. | Previously recorded results: 589 NVA killed; base camps and caches destroyed. At the same time Company H was in the Arizona Territory with 2/5 on Operation Muskogee Meadow (7–20 April) and search and clear operations (May). | Whole operation: 44 (previously recorded figure). | Whole operation: 439 (previously recorded figure). | 589 (previously recorded figure) | Unknown | CORRECTION: H COMPANY DID NOT PARTICIPATE. This file previously said H/2/5 took part in a supporting role. Smith's official history names the 7th Marines, 3/26 and the 51st ARVN Regiment. The only link to 2/5 is that 2/5 relieved BLT 3/26 in the Arizona on 20 March 1969, before 3/26 went into Oklahoma Hills. The 2/5 Command Chronologies for April and May 1969 place the battalion in the Arizona Territory (Duc Duc District) for both months, then on Liberty Bridge security from 22 May. Primary source: 2/5 Command Chronologies, April and May 1969 (Texas Tech University Vietnam Archive items 1201048114 and 1201048115); Charles R. Smith, U.S. Marines in Vietnam: High Mobility and Standdown, 1969 (HQMC, 1988). |
| Operation Muskogee Meadow | Clear and search in Arizona Territory and An Hoa Basin by 5th Marines to engage PAVN/VC forces. Part of ongoing ops to deny enemy use of the An Hoa Basin during Vietnamization. | 6–20 Apr 1969 | Arizona Territory; An Hoa Basin; Quang Nam Province; SW of Da Nang | Arizona Territory and An Hoa Basin; Quang Nam Province; SW of Da Nang | 5th Marines. 2nd Battalion, 5th Marines (LtCol James H. Higgins): Company E (1stLt R.H. Henry; under 5th Marines control 17–28 Apr), Company F (Capt R.N. Kingrey; under 5th Marines control 5–16 Apr), Company G, Company H (Capt W.C. Fite, 1–25 Apr); 106mm recoilless rifle platoon. | The battalion moved into the northern Arizona on 7 April. Contact was light from 7 to 11 April and heavy from 12 April, when 2/5 swept north. 5,000 lb of rice was collected. Company H: on 7 April a Marine set off a booby-trapped M-26 grenade (2 WIA evacuated); on 10 April an Company H platoon took AK-47 and M-79 fire at AT 822492; on 12 April an Company H Marine set off a booby trap. After the operation, on 26 April, about 40 NVA attacked Company H's night position at AT 822472. 284 refugees from the Arizona were resettled during April. | 2/5 for all of April 1969: 9 KIA (chronology). Previously recorded operation figure: 16. Breakdown by 2/5 company: not recorded. | 2/5 for April 1969: 69 WIA evacuated, 53 not evacuated (chronology). Breakdown by 2/5 company: not recorded. | Previously recorded figure: 162 (not re-verified; the April 1969 statistics table is illegible) | Unknown | CONFIRMED H COMPANY ENGAGEMENT. DATES CORRECTED: Source doc confirms 6-20 April 1969. Capt Ron Drez earned Vietnam Cross of Gallantry with Silver Star and PUC for Taylor Common AND Muskogee Meadow. Sources: hotel25vv.com; limathreefive.org; '2-5 Military Operations Vietnam'. |
| Operation Pipestone Canyon | 1st Marines operation to clear and deny Go Noi Island and the Dodge City area. | 26 May – 7 November 1969 | Go Noi Island; Dodge City; Liberty Bridge; Quang Nam Province | Go Noi Island and Dodge City; Quang Nam Province | 1st Marines with 1/1, 3/1 and 3/5 (from Liberty Bridge), Korean Marines and ARVN units. From 22 May 1969 it secured Liberty Bridge and the main supply route from Phu Loc (6) to An Hoa. | Previously recorded results: 852 enemy killed and 58 captured; Go Noi Island defoliated and bulldozed. 2/5's own June 1969 chronology records two companies securing Liberty Bridge and Liberty Road north, with very little enemy contact. In July 2/5 prepared for Operation Durham Peak. | Whole operation: 71 (previously recorded figure). | Not recorded. | 852 (previously recorded figure) | Unknown | CORRECTION: 2/5 AND H COMPANY WERE NOT PIPESTONE CANYON MANEUVER UNITS. This file previously called 2/5's participation "confirmed." Smith's official history does not list 2/5 among the Pipestone Canyon forces. The 2/5 Command Chronologies for May–July 1969 show the battalion on Liberty Bridge and Liberty Road security next to the operation area. PFC Dan Bullock (Company F, 2/5), believed to be the youngest American killed in the war at 15, died on the night of 7 June 1969. The June 1969 chronology records about 15 enemy seen in the wire at Phu Loc (6) that night. Primary source: 2/5 Command Chronologies, May, June and July 1969 (Texas Tech University Vietnam Archive items 1201048115–1201048117); Charles R. Smith, U.S. Marines in Vietnam: High Mobility and Standdown, 1969 (HQMC, 1988). |
| Operation Forsyth Grove | 5th Marines cordon and search operation. A two-kilometer-square objective in the northern Arizona Territory was sealed off at night by three battalions, then searched to deny the local Viet Cong the use of a natural sanctuary. | 010800H – 032400H July 1969 (5th Marines Command Chronology). Units moved into blocking positions during the night of 30 June – 1 July. | Northern Arizona Territory, between the Song Vu Gia and the Song Thu Bon; Duc Duc / Dai Loc districts; Quang Nam Province | Northern Arizona Territory; Quang Nam Province | 5th Marines (Col William J. Zaro): 1st Battalion, 5th Marines (LtCol William E. Riley Jr.) blocking from the south; 2nd Battalion, 5th Marines (LtCol James H. Higgins) blocking from the east; 1st Battalion, 7th Marines (LtCol John A. Dowd, reinforced by a company of 3/7), fording the Song Vu Gia from the north to close the cordon; artillery of the 11th Marines. The legible 2/5 journal entries name Companies E, F and G. | During the night Riley's 1/5 moved into blocking positions on the south, coming up from the southern Arizona. 2/5 made a covert crossing of the Song Thu Bon and took blocking positions on the east. Before sunrise on 1 July, 1/7 forded the Song Vu Gia and closed the trap. The search met only token resistance. On 1 July a Company F, 2/5 platoon moving into position at AT 891554 took fire from two VC/NVA, assaulted, and killed two. Detainees and hidden food were found during the sweeps. | Not stated for the operation (2/5 lost 5 KIA in all of July 1969). Breakdown by 2/5 company: not recorded. | Not stated for the operation. Breakdown by 2/5 company: not recorded. | Not stated for the whole operation; at least 2 by Company F, 2/5 on 1 July | Unknown; detainees taken | 2/5 PARTICIPATION CONFIRMED; H COMPANY'S ROLE NOT IDENTIFIED. This is a new file. Smith's official history names 1/5, 2/5 and 1/7 in Forsyth Grove. The 5th Marines Command Chronology for July 1969 dates it from 0800 on 1 July to 2400 on 3 July. The 2/5 Command Chronology for July 1969 contains an S-3 "FORSYTH GROVE Journal" for 1–3 July, but the scan is badly degraded. Its legible entries name Companies E, F and G, and no entry clearly names Company H, which may have stayed on Liberty Bridge or Road security. RELATED CORRECTION (DURHAM PEAK). Primary source: 5th Marines Command Chronology, July 1969 (Texas Tech University Vietnam Archive item 1201047014); 2/5 Command Chronology, July 1969, including the Forsyth Grove S-3 journal (item 1201048117); 2/1 Command Chronology, July 1969 (item 1201021…. |
| Operation Durham Peak | Search and destroy PAVN units (90th Regiment, 368B Rocket Regiment) that fled Dodge City/Go Noi Island into Que Son Mountains. Locate and engage enemy in Antenna Valley ~10 km south of An Hoa. | 20 Jul – 13 Aug 1969 | Que Son Mountains; Antenna Valley; ~10 km south of An Hoa Combat Base; Quang Nam Province | Que Son Mountains and Antenna Valley; ~10 km south of An Hoa FSB; Quang Nam Province | 5th Marines (Col William J. Zaro): 3/5 (LtCol John M. Terry Jr.), 2/1 (LtCol Harold G. Glasgow), then 1/1; 2nd Battalion, 5th Marines (LtCol James H. Higgins), regimental reserve until committed on 31 July; 37th Battalion, 1st ARVN Ranger Group; Americal Division 196th Brigade and 5th ARVN Regiment blocking; USS Boston (8-inch naval gunfire); 11th Marines. | 20 Jul: the 11th Marines and USS Boston opened the operation; the ARVN Rangers and 3/5 blocked in Antenna Valley, and 2/1 landed in the Phu Loc Valley the next day. 2/5 was held at Phu Loc (6) as regimental reserve (its July chronology records the battalion turning over Liberty Bridge to 1/5 on 20 July and preparing for helicopter operations in the mountains). 25–26 Jul: the sniper and ambush fight on Nui Mat Rang (Hill 845) involved Company H, 2d Battalion, 1st Marines (not H/2/5). 31 Jul: Col Zaro committed 2/5, which set up blocking positions near Hill 848 in the center of the area; its 106mm recoilless rifle platoon fired from Hill 848. | Whole operation: 20 (previously recorded figure). Breakdown by 2/5 company: not recorded. | Whole operation: 100 evacuated (previously recorded figure). Breakdown by 2/5 company: not recorded. | Whole operation: 255 (previously recorded figure) | Unknown | CONFIRMED H COMPANY ENGAGEMENT. YEAR CORRECTED: Source document confirms 1969 (previously recorded as 1968). Capt Ron Drez commanded H Company; committed 31 Jul. Sources: 1stbn4thmarines.net; '2-5 Military Operations Vietnam'; USMC Command Chronologies. |
| Operation Pickens Forest | 7th Marines operation (the 1st Marine Division's first of 1970 outside its regular TAOR) into the southeastern part of Base Area 112, part of the allied summer offensive against Base Areas 112 and 127. | 16 July – 24 August 1970 | Southeastern Base Area 112, straddling the Thu Bon River about nine miles southwest of An Hoa; Quang Nam Province | Base Area 112, southwest of An Hoa; Quang Nam Province | 7th Marines (Col Edmund G. Derning): 1/7 and 2/7, with Quang Da Special Zone ARVN forces working farther west. The 5th Marines' named operations that summer were Barren Green and Lyon Valley. | Previously recorded results: 99 enemy killed; supply caches and fortifications destroyed. During these dates Company H was in the An Hoa Basin and then in Operation Lyon Valley (16–24 August). | Whole operation: 4 (previously recorded figure). | Not recorded. | 99 (previously recorded figure) | Unknown | CORRECTION: H COMPANY DID NOT PARTICIPATE. This file previously said H/2/5 took part in a supporting role. Cosmas and Murray's official history describes Pickens Forest as a 7th Marines operation with 1/7 and 2/7. The 2/5 Command Chronologies for July and August 1970 do not mention Pickens Forest. They record 2/5 on Liberty Road and An Hoa Basin security, in Barren Green (Companies F and G) and in Lyon Valley (Companies F and H). Primary source: 2/5 Command Chronologies, July and August 1970 (Texas Tech University Vietnam Archive items 1201048129 and 1201048130); Graham A. Cosmas and Terrence P. Murray, U.S. |
| Operation Barren Green | Deny the North Vietnamese 38th Regiment the ripened corn in the VC- controlled My Hiep area. 5th Marines' first named operation of 1970. | 24–27 July 1970. A preliminary harvest-security effort was made on 15–16 July. 2/5 companies took part 24–25 July. | My Hiep area, just south of the Song Vu Gia, northern Arizona Territory; Dai Loc District; Quang Nam Province | Northern Arizona Territory south of the Song Vu Gia; Dai Loc District; Quang Nam Province | 5th Marines: companies of 2/5 and 3/5 with a platoon of Company C, 1st Tank Battalion. 2/5's jump command post controlled Company F, Company G and Company I (3/5) in the first phase; 3/5 controlled the second phase. | 15–16 Jul (preliminary): a reinforced 3/5 platoon and Dai Loc Regional Forces protected civilians harvesting 30 tons of corn, until sniper fire and booby traps killed 3 PFs and wounded 8 RFs, 5 civilians and 12 Marines. 24–25 Jul: at first light Companies F, G and I were landed by helicopter in three zones around My Hiep for a cordon and search; the enemy appeared to have been forewarned. A reconnaissance team ambushed NVA carrying corn out of the area and killed 7. Second phase: 3/5 destroyed the standing corn, much of it crushed by tanks. | Not recorded. | 12 Marines wounded on 15–16 July (preliminary phase). Breakdown by 2/5 company: not recorded. | 18 NVA and VC killed | Unknown; 3 prisoners, 4 weapons, about 10,000 lb of corn destroyed | CORRECTION: H COMPANY DID NOT PARTICIPATE. 2/5 did take part. The 2/5 Command Chronology for July 1970 records that on 24–25 July "2nd Battalion, 5th Marines (-)(Rein) participated in operation Barren Green. Maneuver elements... consisting of Company Fox, Company Golf and Company India were controlled by the Battalion jump Command Post." Company H is not listed. In July 1970 Hotel Company (1stLt L.C. Villalobos) was on Liberty Road and An Hoa Basin security; a 250-lb bomb landed outside its perimeter on 13 July without casualties. Cosmas and Murray's official history gives the operation-level figures. Primary source: 2/5 Command Chronology, July 1970 (Texas Tech University Vietnam Archive item 1201048129); Graham A. Cosmas and Terrence P. Murray, U.S. Marines in Vietnam: Vietnamization and Redeployment, 1970-1971 (HQMC, 1986), pp. 82–83. |
| Operation Lyon Valley | 5th Marines' second named operation of summer 1970: stop food moving from the northern Arizona to the 38th NVA Regiment's mountain base areas by blocking trails and destroying camps and caches in the mountains on the southwest edge of the Arizona. | 16–24 August 1970 (Cosmas and Murray; previously listed as 27 July – 24 August) | Mountains southwest of the Arizona Territory; southwestern Arizona; An Hoa; Quang Nam Province | Mountains southwest of the Arizona Territory; Quang Nam Province | 5th Marines. 2nd Battalion, 5th Marines command group with Company F and Company H (Capt John W. Moffett from 13 August 1970); Company L, 3/5 under 2/5 control 16–22 August as a screening force. | 16 Aug: Companies F and H and the battalion command group were landed by helicopter into mountain landing zones and pushed northeast along the trails toward Company L, which screened the northern face of the mountains. The trails showed heavy use; the companies found bunkers, fighting holes, rocket-launching sites and antiaircraft positions, including a captured 12.7mm machine gun. Company F killed 3 NVA in two small firefights. 22 Aug: F and H reached the northern foot of the mountains and flew back to An Hoa. 23 Aug: with minimal preparation fire, F and H landed by helicopter in the southwestern Arizona to catch enemy troops hiding there; | 0 (no Marine combat casualties). Company F: 0; Company H: 0; H&S Company: 0. | 0 from combat; 11 Marines incapacitated by heat stroke and accidents. Breakdown by 2/5 company: not recorded. | 5 enemy killed | Unknown; 1 prisoner, 13 base camps destroyed, 2 weapons and over 3 tons of food captured | CONFIRMED H COMPANY PARTICIPATION. Cosmas and Murray's official history states that "On 16 August, Companies F and H of the 2d Battalion with a battalion command group were inserted by helicopter into mountain landing zones." The 2/5 Command Chronology for August 1970 records the operation "in the Southern Arizona mountains with noteworthy results." The August roster lists 1stLt L.C. Villalobos commanding H Company 1–12 August and Capt John W. Moffett from 13 August 1970. Corrected dates: 16–24 August 1970. Primary source: 2/5 Command Chronology, August 1970 (Texas Tech University Vietnam Archive item 1201048130); Graham A. Cosmas and Terrence P. Murray, U.S. Marines in Vietnam: Vietnamization and Redeployment, 1970-1971 (HQMC, 1986), p. 83. |
| Operation Imperial Lake | Final major operation of 1st Marine Division in Vietnam. Maintain pressure on NVA in Que Son District while supporting Vietnamization; provide security for ARVN assuming primary combat role; conduct small-unit patrols. | 1 Sep 1970 – 7 May 1971 | Que Son District; Quang Nam Province; LZ Baldy; LZ Rainbow (formerly LZ Vulture); An Hoa Combat Base | Que Son District; Quang Nam Province; LZ Baldy area; An Hoa sector | 7th Marines (September 1970), then 5th Marines (Col Clark V. Judge; regimental HQ at LZ Baldy from 20 September 1970), then 1st Marines from 3 March 1971. 2nd Battalion, 5th Marines, including Company H (Capt John W. Moffett), with 3/5, 1/5 and 1st Reconnaissance Battalion teams. | 21 Oct 1970: Company H's 3d Platoon was landed four miles southeast of FSB Rainbow and found more than 1,000 lb of rice buried in urns. 22 Oct: two Company H quick reaction platoons killed 4 NVA and found a bunker complex. The same day, 3d Platoon corpsman HM2 Randall L. Hackett found he was sitting on a Composition B booby trap; Capt Moffett held the detonator while Hackett rolled clear, and the device was destroyed. Late October: Tropical Storm Kate cut off resupply, and Companies F and H lived on short rations or none. | Whole operation: 24 Marines killed (Cosmas and Murray). Breakdown by 2/5 company: not recorded. | Not recorded. | Whole operation: 305 VC/NVA killed (Cosmas and Murray) | Unknown | FINAL OPERATION. H Company, 2/5 Marines departed An Hoa early 1971. Participated in dismantling of An Hoa. 2/5 Marines stood down ~3 March 1971 after 5+ years of continuous Vietnam service. Sources: USMC Command Chronologies; hotel25vv.com. |
| Operation Catawba Falls | A large artillery diversion into Base Area 112 to keep the enemy off balance while the 5th Marines moved out of An Hoa and the Vu Gia valley and the 7th Marines redeployed. It began as a 5th Marines plan (Col Clark V. Judge) for a two-battalion infantry operation against the 38th NVA Regiment headquarters; the infantry sweep was kept only as a ruse. | 18 September – noon 21 September 1970 (Fire Support Base Dagger occupied from 26 August; guns lifted in 17 September) | Fire Support Base Dagger, on Ban Co (1,031 m), about 10 miles west of An Hoa; Base Area 112; Hill 65; An Hoa; Quang Nam Province | Base Area 112, west of An Hoa; Quang Nam Province | Phase I was run by the 11th Marines under direct control of MajGen Charles F. Widdecke, commanding the 1st Marine Division; 2d Battalion, 11th Marines (Maj George W. Ryhanych) with a composite battery of 105mm and 155mm howitzers and 4.2-inch mortars on FSB Dagger; 1st 175mm Gun Battery at An Hoa and an Army 175mm platoon (2/92d Artillery) on Hill 65; 3d Platoon, Company I, 3/5 as firebase security; 1st Marine Aircraft Wing. | 76 helicopter lifts moved guns, crews and ammunition to Dagger on 17 September. From dawn on 18 September to noon on 21 September the batteries fired more than 11,500 rounds at 160 intelligence targets, pausing for 1st MAW jets, which dropped 141 tons of bombs. Intelligence later estimated casualties to several enemy units. | Not recorded. | Not recorded. | Not Available (intelligence estimates only) | Unknown | CORRECTION: H COMPANY AND 2/5 WERE NOT PARTICIPANTS. This file previously listed 2/5 among the units. Cosmas and Murray's official history shows Catawba Falls as an artillery attack run by the 11th Marines. Marine rifle companies made no real heliborne assaults; the infantry phase existed only to deceive the enemy, and the only infantry present was a 3/5 security platoon on FSB Dagger. At the time 2/5 was moving from An Hoa to LZ Baldy. Its elements displaced to Baldy on 20 September 1970, according to the September 1970 chronology. Primary source: 2/5 Command Chronology, September 1970 (Texas Tech University Vietnam Archive item 1201049001); Graham A. Cosmas and Terrence P. Murray, U.S. Marines in Vietnam: Vietnamization and Redeployment, 1970-1971 (HQMC, 1986), pp. 97–100. |
| Operation Tolare I | U.S.–South Vietnamese–South Korean operation, coordinated by the Quang Nam Province Chief, to head off a predicted wave of enemy attacks in the populated area between Hill 55 and the Que Son Mountains. | 2–15 October 1970 (Task Force Saint CP opened 2 October; operations began 3 October) | North and east of LZ Baldy; the lowlands between Hill 55 and the Que Son Mountains; Quang Nam Province | Lowlands north and east of LZ Baldy; Quang Nam Province | The 5th Marines commanded all American troops, but because its battalions were fully committed, the maneuver force was Task Force Saint (LtCol C.E. Saint, USA) from the Americal Division's 196th Brigade: 2d Battalion 1st Infantry, 1st Squadron (-) 1st Armored Cavalry, an air cavalry troop, and a 105mm platoon of 3/82d Artillery. The only 2/5 element involved was the Company G combined unit pacification (CUPP) Marines who guided the Army units. | The Army troops blanketed the countryside with small-unit patrols and ambushes, using the air cavalry troop as a quick reaction force. The operation succeeded in forestalling the expected attacks, and Task Force Saint returned to the Americal Division area on 15 October. | Not stated (Army task force: 19 wounded). Breakdown by 2/5 company: not recorded. | Army task force: 19 wounded. Breakdown by 2/5 company: not recorded. | 30 NVA and VC killed | Unknown; 21 suspected VC detained | CORRECTION: H COMPANY DID NOT PARTICIPATE, AND THE CORRECT NAME IS "TULARE FALLS I." Cosmas and Murray's official history identifies this as Operation Tulare Falls I, an Army task force operation under 5th Marines control, guided by Company G, 2/5's CUPP Marines. H Company, 2/5 was then committed to Operation Imperial Lake in the Que Son Mountains; from 21 October its platoons served as quick reaction forces near FSB Rainbow. The file name is unchanged so existing links still work. Primary source: 2/5 Command Chronology, October 1970 (Texas Tech University Vietnam Archive item 1201049002); Graham A. Cosmas and Terrence P. Murray, U.S. Marines in Vietnam: Vietnamization and Redeployment, 1970-1971 (HQMC, 1986), pp. 116–118. |
| Operation Noble Canyon | 3/5's only named operation of the fall-winter campaign: clear enemy troops from the cave-riddled area around Hill 441, long used by the NVA and VC as an assembly area for attacks into the Que Son Valley and toward Hiep Duc. | 23 October – 3 November 1970 (previously listed as 22 October – 3 November) | Hill 441, about four miles south of Fire Support Base Ross; Que Son Valley; Quang Nam Province | Hill 441 area south of FSB Ross; Quang Nam Province | Company L, 3rd Battalion, 5th Marines only. | Bad weather cancelled the planned helicopter lift, so Company L marched into the area on 23 October and searched it until 3 November despite the late-October storms. Contacts were light and scattered; no large enemy units or supply caches were found. | 0 (Company L, 3/5). | 8 (Company L, 3/5). | 4 | Unknown; 1 VC suspect detained | CORRECTION: H COMPANY AND 2/5 DID NOT PARTICIPATE. This file previously listed 2/5. Cosmas and Murray's official history identifies Noble Canyon as a 3/5 operation carried out by Company L alone. During those dates H Company, 2/5 was in the Que Son Mountains on Operation Imperial Lake. Its 2d Platoon found an abandoned battalion-size enemy base camp on 26 October 1970, and it was short of rations during Tropical Storm Kate. Primary source: 2/5 Command Chronologies, October and November 1970 (Texas Tech University Vietnam Archive items 1201049002 and 1201049003); Graham A. Cosmas and Terrence P. Murray, U.S. |
| Operation Tolare II | Follow-on to Tulare Falls I, planned jointly by the 1st Marine Division and the Americal Division, to keep enemy forces out of the populated lowlands around the northeastern foothills of the Que Son Mountains. | 27 October – 30 November 1970 (Task Force Burnett CP set up at LZ Baldy 27–31 October; patrolling until 30 November); previously listed as the single date 27 October 1970 | Northeastern foothills of the Que Son Mountains; LZ Baldy area; Quang Nam Province | Northeastern Que Son foothills; Quang Nam Province | Task Force Burnett (the Army units of the former Task Force Saint, Americal Division 196th Brigade) under 5th Marines operational control, guided by 2/5's Company G CUPP Marines. | The Army force used the same tactics as in Tulare Falls I: saturation patrolling and ambushes, with air cavalry as a quick reaction force. | Not recorded. | Not recorded. | Not Available | Unknown | CORRECTION: H COMPANY DID NOT PARTICIPATE; CORRECT NAME AND DATES. Cosmas and Murray's official history identifies this as Operation Tulare Falls II, an Army task force operation under 5th Marines control from 27–31 October to 30 November 1970. During that period H Company, 2/5 was in Operation Imperial Lake in the Que Son Mountains. The file name is unchanged so existing links still work. Primary source: 2/5 Command Chronologies, October and November 1970 (Texas Tech University Vietnam Archive items 1201049002 and 1201049003); Graham A. Cosmas and Terrence P. Murray, U.S. |
In this section
Last updated October 19, 2026